Concrete Finisher Manual (Version 1) 

 

11 

Moving the Concrete Finisher

 

Get into the operator’s position behind the centre of handle with good footing and apply the throttle 

slowly until desired speed is obtained. The blades of the concrete finisher  spin in a clockwise 

direction. All ESI concrete finisher are directed left or right by applying a slight upward (lifting) or 

downward (lowering) pressure on the handle (respectively). 

 

 

Push handle down and machine will move to the right. 

 

Lift handle up and machine will move to the left. 

 

Slightly twist to the right and the machine will move 

forward. 

 

Slightly twist to the left and the machine will move 

backward. 

 

Holding the handle in neutral position, the machine will 

remain stationary. 

 

Preparation of Concrete Surface 

Use of a mechanical or air vibrating screeding machine to strike the concrete surface to level will 

provide good compaction to the slab and produce an ideal surface for finishing. It should  be 

remembered floating/finishing machines will not repair or correct a poorly screeded slab. 

 

Floating Operation 

Floating can be performed by using either the combination blades (furnished with the machine) or 

the optional Float Pan. If using the float pan before starting the floating operation, be sure that the 

pan is correctly mounted on the concrete finisher blades. The slab will be ready to work for the first 

floating operation when the heel of your shoes leave a print of 2~3mm on the surface of the slab. If 

combo blades are brought to use for floating they should be flat. After the floated slab has set and 

your  footprint is  only  slightly visible, it is ready to start the finishing operation. The timing of all 

these operations is dependent on weather conditions. After each operation, the engine should be 

stopped. 

 

Never park the machine with the engine running, especially during the floating operation when the 

concrete is relatively soft. Considering the machine is heavy  it  should  never  be left running or 

parked  on the soft concrete in the same spot, this will cause damage to the finished floor 

tolerances. 

 

Finishing Operation 

After the floating operation, the first thing to do is to remove the  float  pan  (if used) from the 

concrete finisher  blades.  Clean  the blades, spider plate and protection ring of cement/concrete 

Summary of Contents for EWT120

Page 1: ...Operator s Manual Concrete Finishers Range Concrete Finisher EWT90 EWT120 Manual Version 1...

Page 2: ...2 Concrete Finisher Proposition Warning...

Page 3: ...e s curit des machines et des crit res associ s et configur s si applicable Les missions debruit sont conformes la directive 2005 88 CE Annexe VI pour machines article 12 L objet mentionn est T V Rhei...

Page 4: ...SI reserves the right to change machine specification without prior notice or obligation Safety Notation Explanation Texts in this manual to which special attention must be paid are shown in the follo...

Page 5: ...fely switch this machine OFF before you switch it ON in case you run into any difficulties Always switch OFF the engine before servicing it During use the engine becomes very hot Always allow the engi...

Page 6: ...vapors and avoid contact with your skin Wash fuel splashes immediately If you get fuel in your eyes irrigate with a large amount of water and seek medical attention as soon as possible Exhaust Fumes P...

Page 7: ...t of the machine s components and their respective materials Take the discarded apparatus to the relevant recycling facilities Component Material Operator Handle Steel Belt Guard Glass Fiber Blade Gua...

Page 8: ...Tank 7 Recoil Starter 8 Blade Guard 9 Belt Guard 10 Handle Height Adjuster 11 Lifting Bar 5 4 6 7 9 8 3 10 2 1 11 1 Throttle Lever 2 Pitch Control Lever 3 Centri safety Switch Handle 4 Handle Height A...

Page 9: ...gine oil with the proper viscosity SAE 10W 30 recommended 4 Check the engine fuel level and top up as necessary Use clean fuel Use of contaminated fuel would damage the fuel system Do not overfill fue...

Page 10: ...upply Refer to Engine User Manual Operation Before Starting the Engine 1 Visually check to be sure that the blades are free of obstructions and the area is clear for operation 2 Grip the operator s ha...

Page 11: ...ab Floating Operation Floating can be performed by using either the combination blades furnished with the machine or the optional Float Pan If using the float pan before starting the floating operatio...

Page 12: ...sher at all times Pitch Adjustment The pitch control knob or the optional blade pitch lever is in easy reach of the operator The pitch adjustment has a limited pitch variation Rotate the pitch control...

Page 13: ...cleaned with a high pressure hose and water while the concrete is still wet Hard cement concrete is very difficult to remove Immediately replace any labels stickers should you notice that they are wo...

Page 14: ...nally replace the belt guard ensuring it is correctly and securely fitted Routine maintenance Daily After first 4 hrs weekly First month 20 hours Every 3 months 50 hrs Every 6 months 100 hrs Air Filte...

Page 15: ...dd oil to the recommended level b Keep speed high c Clean air filter d Remove cement concrete on concrete finisher e Retighten V belt Machine engine runs but machine does not a Presence of water in th...

Page 16: ...ING DIAMETER in mm 39 1 992 47 2 1 200 OPERATING WEIGHT lb kg 170 77 209 95 HANDLE TYPE STRAIGHT STRAIGHT GEARBOX HEAVY DUTY HEAVY DUTY MAX BLADE PITCH ANGLE 15 15 NO OF BLADES 4 4 BLADE OPERATING SPE...

Page 17: ...sh away concrete accumulated on the concrete finisher Clean the engine mounting plate Apply a light coat of oil on arbor shaft blade retaining cap and backing plate to prevent rust formation Cover the...

Page 18: ...o renew repair or replace components due to fair wear and tear 5 The engine air filter and the engine spark plug The engine will be warranted by the engine manufacturer Please contact the nearest engi...

Page 19: ...Notes...

Page 20: ...EQUIPMENT SYNERGY INTERNATIONAL 7422 Rock Hollow Lane PO Box 1902 Midland Michigan 48642 48641 USA 1 336 454 2665 1 866 648 7101 service theESIchoice com www theESIchoice com...

Reviews:

Related manuals for EWT120