background image

3.   Overloading can cause damage to or failure of the unit. 
4.   Make sure load is centered and secure before transporting. 
5.   Keep hands clear of all pinch points. 
6.   Do not use if you detect structure failure during use. 
7.   Do not use if any component is found missing or damaged. 

 

Specifications: 

 

 Capacity:                         1000 lbs      ( 1/2 ton )  
  Lifting Height:                                          39 – 5/8”             
  Overall Width:                                          43 – 3/8” 
  Overall Length:                                        46” 
 Overall Unit Height:                63 – 9/16” 
 Width of Lifting Arms:              24 – 1/4” 
 Arm Conveyor Length:             19 – 5/8” 
 Side Shifting Adjustment:           Right :  3 – 1/2”    Left : 3” 
  Max: Arm Tilt Angle:                              28” 
 Min. Support Log Clearance:        6” 
 Min. Arm Elevation :                2 – 1/8 “ 

 

Assembling 

 

1. 

Take out the parts and components from the box. Check all the listed items with the packing list provided to 
make sure all the parts are not missing. 

 

2. Follow the exploded drawing enclosed to assemble the casters, winch and fasten all the bolts and nuts.   

 

Operation 

 

1. Turn the winch clockwise to rise up the lifting arms. It can be stopped at any desired position as the winch 

gear can act as a brake. To lower down the lifting arms, just turn the winch counter clockwise slowly. 

2. Roll the dolly into position; let tires rest comfortably on the dolly against the lifting arms.    Be sure to have the 

safety chain to secure the loads on the hook of the lifting arms. Then the dolly can be moved freely to any 
position you intend to. 

3. Reinstalling tire is just as easy.  Roll the dolly into place, line up the studs with the holes in the drum and 

push into place.    By rotating the tire, the height of dolly can be adjusted easily for alignment of the studs into 
the holes.   

4. To match the angle of the spindle and to aid axle realignment, the lifting arms can be adjusted towards left or 

right simply by rotating the side handle equipped on the lifting arm. The angle of the lifting arm can also be 
tilted by pumping up the hydraulic bottle jack which is fitted on the back of the dolly.   

 
Maintenance 

 

All dolly linkage, moving joints require frequent lubrication.  Any chassis grease and motor oil can be used. 

 

1. Use a grease gun and grease the winch to ensure rotating adjustment can be done smoothly. 
2. Apply grease regularly to the moving joints. 

 

15270 Flight Path Drive 

y

 Brooksville Fl, 34604 

y

 Phone 800-352-9852 

y

 Fax 352-754-4508 

Website www.esco.net 

y

 Email [email protected] 

 

Reviews: