background image

5

INSTALLATION TIMELINE

1.

Prior to anchor system and goal assembly,  call utility services for location of underground utility lines before you dig.

2.

Vertical main post assembly is a two part process.

ANCHOR SYSTEM INSTALLATION INSTRUCTIONS (Day 1)

Before digging hole for anchor system, check for
buried power, gas, water, and telecommunication
lines! Failure to do so could result in serious or fatal
injury! Contact your local utility company if unsure.

PART 1

Day 1.

Complete Anchor System Installation Instructions.
(Below)

Day 2-4.

Allow concrete to cure.

PART 2

Day 5.

Complete Goalrilla

TM

assembly instructions. (Requires

four adults)

Figure 1

Figure 2

2.

Assemble anchor system as follows: Thread nut (#35) to bottom
of threads on anchor bolt (#39) insert threads of anchor bolt
(#39) through hole on anchor plate (#38) and secure with nut
(#35). Repeat this step for the remaining
anchor bolts. See
Figure 2. Note:
Each

leg

of

anchor

bolts

should face the
anchor bolt to the
right. See Detail
A.

1.

Determine the location of the anchor
system. The proper location is as close to
the court without making contact, as
shown in Figure 1. This,
however,is a general rule.
If you need to locate the
anchor system in a location other than
this, use the following dimensions as a
guide.

Items needed for Anchor Installation (not included)

9 - 80 lb. bags of concrete
1 - post hole digger (optional)
1 - 15/16” open end wrench
1 - 15/16” socket and ratchet (optional)

1 - wheel barrow
1 - garden hose
1 - level
1 - tape measure

Note: For best results with less vibration, anchor system
should be independent of court. If pouring concrete for
both at same time, add an expansion joint in between.

Overhang when adjusted to 10 ft. = 31 1/2”

1 - concrete form (see note after step 2)

THESE NUTS 

USED FOR 

LEVELING

OVERHANG

18 INCH

MINIMUM

REAR

CLEARANCE

REQUIRED

Note: When digging hole, if you hit rock 
and cannot dig through contact a contractor.

Note: Using a concrete form for the top 4" of the concrete
is recommended. Cardboard forms can be purchased at
some hardware and home stores or a wooden form can
be constructed out of 2 x 4's.

3.

Mix and pour concrete into hole. Follow instructions on
concrete bag. Stop about 18" below court level.

4.

Insert four reinforcement bars (#40) into concrete 8" apart
creating a square in center on hole.

5.

Place form in desired location and finish pouring concrete
up to court level.

6.

Push anchor system into concrete and agitate to work out
voids in concrete. Immediately use a level to level and square
anchor plate to playing surface. Clean off any concrete that
may be on exposed threads

.

Let concrete stand for a MINIMUM of 72 hours.

Note: The bottom four nuts will be forever embedded in
concrete.  The top four nuts remain on bolts and are 
used for leveling.  (See Step 11 on page 8)

Note: Failure to dig and fill hole as instructed will result 
in increased system vibration.

Summary of Contents for GOALRILLA CV B3303F

Page 1: ...scalade Sports customer service department at Phone 1 888 USA GOAL Toll Free Fax 1 866 873 3536 Toll Free E mail basketball escaladesports com Mailing Address Escalade Sports PO Box 889 Evansville IN...

Page 2: ...2 4L 8090 01...

Page 3: ...sher 8 Pieces 37 5 8 Thread Protector 4 Pieces 34 Hardware located in Anchor kit box 1 2 Split Lock Washer 2 Pieces 18 13 x 1 Hex Bolt 2 Pieces 19 Flat Washer 2 Pieces 3 1 2 1 2 Pull Pin 1 Piece 41 Ha...

Page 4: ...ed 1 2 13 x 10 Hex Bolt 3 Pieces 3 8 Flat Washer 8 Pieces 47 24 3 8 16 X 1 1 4 Hex Bolt 4 Pieces 25 Hardware required for rim assembly 24 3 Flat Washer 12 Pieces 12 1 2 13 X 1 3 4 Hex Bolt 2 Pieces 4...

Page 5: ...concrete 1 post hole digger optional 1 15 16 open end wrench 1 15 16 socket and ratchet optional 1 wheel barrow 1 garden hose 1 level 1 tape measure Note For best results with less vibration anchor s...

Page 6: ...NOTE It may be necessary to use a rubber mallet to tap in Pivot Tube 6 3 Lay Pole 2 on its side on two padded saw horses Attach Actuator 16 to Pole 2 using one bolt 19 split lockwasher 18 washer 3 an...

Page 7: ...shown in Figure 5 using a bolt 8 two flatwashers 3 four plastic washers 5 and hex nut 4 Note make sure Goalrilla lettering is right side up Do NOT tighten bolt 8 at this time 5 Secure Actuator 16 to...

Page 8: ...the Safety Stop PLACING THE POST ON THE ANCHOR SYSTEM REQUIRES AT LEAST FOUR CAPABLE ADULTS POLE WILL WANT TO LEAN WHILE ATTEMPTING TO STAND IT UP ON ANCHOR BOLTS BE SURE CONCRETE HAS BEEN ALLOWED TO...

Page 9: ...Figure 10 21 Detail B Detail A 14 of bracket on each side of the Backboard 23 as shown in Detail A 15 Insert two Board Bushings 33 in to the rim support 21 See Detail B Insert a Two Way Step Bushing...

Page 10: ...hown in Detail C DO NOT drill through both sides of tube Note Cordless drill recommended for screw installation Do not over tighten screws Secure Backboard pads using screws provided 12 Start with the...

Page 11: ...e Figure 14 24 Two adults are recommended for this step one to level and one to adjust the bottom 35 nuts If further leveling is required loosen top 35 nuts but do not loosen past the top of 39 J Bolt...

Page 12: ...cloth and glass cleaner Clean glass as you would clean household windows Strong cleansers will damage backboard and void warranty RIM Only hang from the rim briefly to regain balance or avoid injurin...

Page 13: ...ations or liability on the part of the purchaser and Escalade Sports neither assumes nor authorizes any other person to assume for it any other liability in connection with the goods sold This warrant...

Page 14: ...ersal Post Assembly 1 2 Flat Washer 1 2 13 Nylon Locknut 1 2 X 1 1 4 Plastic Washer Upper Board Arm 1 2 13 X 9 Hex Bolt Grade 5 1 2 13 X 10 Hex Bolt Grade 5 1 X 2 T ube Plug 1 9 16 X3 5 32 T ube Plug...

Page 15: ...15 2L 7218 01 1 12 12 12 45 44 Right Left 46 19 18 3 5 48 25 47 48 25 5 3 18 19 47 24 47 47 24...

Page 16: ...16...

Reviews: