11.
Attach Post Ears (#30) to holes near the bottom of Top
Post (#3) using two hex bolts (#25) four washers (#18)
and two lock nuts (#4). See
Figure 6
&
Detail 2
.
3
2
IMPORTANT! BE SURE CONCRETE HAS BEEN
ALLOWED TO CURE FOR AT LEAST 2 DAYS.
Figure 6
ASSEMBLY INSTRUCTIONS (Day 3)
Figure 7
Detail 2
7
13.
14.
Place Pole Cap (#1) onto top of Top Pole (#3).
Note:
Pole
15.
Secure two stop spacers (#10) to pole, as shown in
Figure 7
using one hex bolt (#7) and one lock nut (#4).
Slide tab on Actuator (#16) between Post Ears (#30) and
Secure using one bolt (#19), two washers (#20) and one
lock nut(#21). See
Figure 7
. Tighten bolts tight.
Cap may be pre-installed by the factory.
Note: If necessary, use a rubber mallet to tap in
Pivot Tube (#14)
12.
7
1
10
4
14
15
16
19
20
21
13
Slide Actuator Sleeve (#15) over Actuator (#16) and place Actuator
Cap (#13) on top.
Align holes in all 3 parts
and slide Pivot
Tube (#14) through holes
in Actuator Cap (#13) Plastic Actuator
Sleeve (#15) and Steel Actuator (#16) until equal amounts stick out
through both sides of actuator. See
Figure 7
.