3.8
pT-38 Torch Installation
1. Open torch lead access door on the front panel of the Powercut 900.
MAKE SUrE pOWEr SWITCH ON CONSOLE IS IN Off pOSITION AND
prIMArY INpUT pOWEr IS DE-ENErgIZED.
WArNINg
Torch Lead
Access
Door
3.7
Secondary Output Connections for Manual Cutting
figure 3-4. powercut Interconnection Diagram
WORK
SAFETY
GROUND
PT-38 Cutting Torch
The PT-38 torch comes factory installed with the
manual packages.
Clamp the work cable to the workpiece. Be sure
the workpiece is connected to an approved earth
ground with a properly sized ground cable.
Summary of Contents for Powercut 900
Page 17: ...17 MANUAL PLASMARC CUTTING PACKAGE Powercut 900...
Page 18: ...18...
Page 30: ...30 SECTION 3 INSTALLATION...
Page 38: ...38 section 4 operation...
Page 39: ...39 MECHANIZED PLASMARC CUTTING PACKAGE Powercut 900...
Page 40: ...40...
Page 57: ...57 Powercut 900 MAINTENANCE TROUBLESHOOTING SCHEMATIC DIAGRAMS REPLACEMENT PARTS...
Page 58: ...58...
Page 62: ...62 section 5 maintenance...
Page 70: ...70 notes...