−
13
−
clka0de1
INSTALLATION
To be able to operate the LKA 150 at maximum power (position 7), it must be supplied via a
16 A slow
−
blow fuse. However, a 10 A slow
−
blow fuse is sufficient for welding at currents
up to about 100 A.
S
Place the machine in a suitable position and check that cooling is not obstructed.
S
Check that the mains voltage is 230
−
240 V.
Make the necessary earth connections in accordance with safety regulations.
S
Fit the filler wire as shown below.
clka0p09
If the drive rollers slip or wire feed does not work properly, it may be necessary to adjust the
roller pressure, as shown in Figure 5 above.
clka0p10
SOLID WIRE
GASLESS WIRE
When welding with gasless wire, the return current cable must be connected to the positive
terminal on the terminal block above the wire feed unit.
Summary of Contents for LKA 150
Page 1: ...0349 300 001 Valid for serial no 923 xxx xxxx 040928 LKA 150 clka0p00 Service manual ...
Page 7: ...clka0e01 5 clka0de1 CONNECTION DIAGRAM LKA 150 ...
Page 8: ...clka0e02 6 clka0de1 CIRCUIT DIAGRAM CIRCUIT BOARD AP1 ...
Page 11: ...clka0e02 9 clka0de1 CIRCUIT DIAGRAM CIRCUIT BOARD AP1 ...
Page 13: ... 11 clka0de1 LOAD CHARACTERISTIC LKA 150 clka0p06 ...
Page 17: ... 15 clka0de1 WELDING DATA SELECTION clka0p13 ...
Page 18: ......
Page 21: ...clka0p02 18 clka0se1 ...
Page 23: ...clka0p03 20 clka0se1 ...