![ESAB HANDY PLASMA 125 Instruction Manual Download Page 17](http://html1.mh-extra.com/html/esab/handy-plasma-125/handy-plasma-125_instruction-manual_2425014017.webp)
17
SECTION
6
INSTALLATION, OPERATION AND MAINTENANCE OF PT-34 TORCH
Fig. 6.5 - Power Cable and Switch Disassembly Sequence
!
WARNING
BE SURE to tighten fittings securely using 2 wrenches
during reassembly. (Factory recommended torque
is 30 in-lbs). Failure to do so could result in serious
injury to the operator.
Pull flex support back.
Remove tape holding
splices.
1
2
3
Slide switch and band from
handle. Snip leads at splice
to replace switch.
Unscrew handle and
power cable from head