background image

Phone Order

  0466 909 653

Email Order

  [email protected]

Fax Order

  07 3041 3232

Order Online 

  www.olct.co

+

AA

BATT

BATT

200 

TEST

200k

V

1000

Ω
Ω

8

4

3

+

+

+

+

AA

AA

AA

+

AA

AA

750 V

 

2.  PARTS & CONTROLS 

 

Digital Display 

 

Data Hold Button 

 

Lock Button 

 

Backlight Button 

 

Test Button 

 

Rotary Function switch 

 

Ω

  Jack

 

 

COM input jack

 

 

Pothook 

 

Battery Cover

 

 
 
 
 
 
 
 
 
 
 
 

3.  BATTERY REPLACEMENT 
3-1 How to connect test leads. 

a). On M

Ω

  Range: Connect the red test lead into the “

Ω

” terminal and the black lead into the “COM” terminal. 

b) On 200

Ω

  and ACV Range: Connect the red test lead into the “

Ω

” terminal and the black lead into terminal 

“COM” 
 

3-2 Battery Check-UP & Replacement 

a)  When battery power is not sufficient, LCD will display the low battery symbol. “        “    Replacement of 6 new 

batteries, type 1.5V size “AA” is required. 

b). Place back the battery cover and four the screws. 
 

3-3 Test leads check 

Set the range select switch to the 200

Ω

  range. With the tip and alligator clip of the test leads connected. The 

indicator should read 00.0

Ω

. When the leads are not connected the display will read infinity indicated by “1”. This 

will ensure that test lead are in good working condition. 
 

4.  INSULATION RESISTANCE MEASUREMENTS 

a). 

Measurements at 200M

Ω

/250V 

This  is  the  voltage  used  for  the  majority  of  insulation  resistance  tests  on  normal  installation  requirement.    To 
measure insulation resistance, press the test button to power on the tester. The LCD will display the insulation 
resistance.    Section VII indicated that subdivision of large installations might be necessary because of the large 
number of parallel insulation resistance.  In such a case, an installation may be divided into sections, each being 
separately tested.    Each section must have not less than fifty outlets, an outlet being a switch, socket, lighting 
point  etc.    A  switched  socket  counts  as  one  outlet.    The  minimum  acceptable  insulation  resistance  is  1M

Ω

.   

For  a  large  installation,  the  capacitance  of  the  insulation  will  be  high,  and  it  will  take  longer  for  it  to  become 
charged by the direct testing voltage.  Care must be taken not to take a reading until there is a steady reading, 

Summary of Contents for 550

Page 1: ... continuity disconnect circuit from main power supply and all loads from the circuit Safety symbols Caution refer to this manual before using the meter Dangerous voltages Meter is protected throughout by double insulation or reinforced insulation When servicing use only specified replacement parts CE Comply with EN 61010 1 1 SPECIFICATIONS 1 1 General Information Environment conditions Installatio...

Page 2: ...Overload Protection 200Ω 0 1 Ω 4 5V 200k Ω 0 1k Ω 1 2 3 0V 250Vrms Continuity Beeper Range Resolution Operation Resistance Max open Circuit Voltage Overload Protection 0 1 Ω Resistance 40Ω 4 5V 250Vrms Short circuit current 200mA DC Voltage Range Resolution Accuracy Input Impedance Overload Protection 1000V 1V 0 8 3 10MΩ 1000Vrms AC Voltage 40Hz 400Hz Range Resolution Accuracy Input Impedance Over...

Page 3: ...connected The indicator should read 00 0 Ω When the leads are not connected the display will read infinity indicated by 1 This will ensure that test lead are in good working condition 4 INSULATION RESISTANCE MEASUREMENTS a Measurements at 200M Ω 250V This is the voltage used for the majority of insulation resistance tests on normal installation requirement To measure insulation resistance press th...

Page 4: ...tely 40 Ω it will be indicated by a continuous beep 6 AC DC VOLTAGE MEASUREMENTS a Set the range switch to ACV or DCV position b Connect red test lead to V Ω terminal and black test lead to terminal COM b Connect test prods of test leads IN PARALLEL to the circuit being measured c Read the voltage value on LCD 7 POWER TOOLS AND SMALL APPLIANCES This test would also apply to other similar equipment...

Page 5: ...lead sheath by connecting one megohmmeter lead to a ground and or lead sheather and the other megohmmeter lead to each of the conductors in turn Check insulation resistance between conductors by connecting megohmmeter leads to conductors in pairs For after sale service please send to Electronic Specialties Inc 139 Elizabeth Ln Genoa City WI 53128 Phone 262 279 1400 Fax 262 279 1300 For more qualit...

Reviews: