
RBS 2308 and RBS 2309 User’s Guide
6.
Hang the MBU on the bolts,
applying just enough downward
pressure to ensure that the
screws fit in the keyholes.
P010120A
7.
Tighten the four bolts.
8.
Connect site earthing to the
MBU.
Note:
In configurations with
more than one RRU and a 2-wire
DC Supply, an extra earthing
cable must be connected
between the RBSs.
P010190B
8 - 9 mm
49
EN/LZT 720 0027 Uen R8A 2006-06-27
Summary of Contents for RBS 2308
Page 1: ...Ericsson GSM System RBS 2308 and RBS 2309 User s Guide EN LZT 720 0027 R8A...
Page 2: ......
Page 3: ...RBS 2308 and RBS 2309 User s Guide...
Page 8: ...RBS 2308 and RBS 2309 User s Guide EN LZT 720 0027 Uen R8A 2006 06 27...
Page 34: ...RBS 2308 and RBS 2309 User s Guide 26 EN LZT 720 0027 Uen R8A 2006 06 27...
Page 42: ...RBS 2308 and RBS 2309 User s Guide 34 EN LZT 720 0027 Uen R8A 2006 06 27...