Installation and Integration Process Overview
This section describes the overall Installation and Integration process. This
process covers the work that follows the Installation Engineering process:
testing the antenna system, installing the cabinet, performing site installation
tests, and integrating the site into the network. A process overview is shown
below.
P016157A
Antenna System Tests
Site Installation Tests
RBS Site Integration
Cabinet Installation
Installation Engineering
Figure 3
Installation and Integration Process
1.4
Radio Site Implementation Process
This section describes the overall Radio Site Implementation process, of which
the Installation and Integration process is a part. The Radio Site Implementation
process covers the work from the initial stages of receiving an order, planning
and designing the entire network, to installing the RBS sites and integrating
them into the network.
5
EN/LZT 720 0027 Uen R8A 2006-06-27
Summary of Contents for RBS 2308
Page 1: ...Ericsson GSM System RBS 2308 and RBS 2309 User s Guide EN LZT 720 0027 R8A...
Page 2: ......
Page 3: ...RBS 2308 and RBS 2309 User s Guide...
Page 8: ...RBS 2308 and RBS 2309 User s Guide EN LZT 720 0027 Uen R8A 2006 06 27...
Page 34: ...RBS 2308 and RBS 2309 User s Guide 26 EN LZT 720 0027 Uen R8A 2006 06 27...
Page 42: ...RBS 2308 and RBS 2309 User s Guide 34 EN LZT 720 0027 Uen R8A 2006 06 27...