
Installation
3/1531-HSD 101 41 Uen E 2007-08-13
11
6 Installation
6.1
Preparation for Installation
The subrack is delivered in a cardboard box including assembly
instructions.
In Figure 8 on page 11 the assembled empty subrack is shown.
Figure 8
Assembled ETSI subrack
6.2
Mounting the EDN612, ESN212 and EPN210
Nodes
The EDN612, ESN212 and EPN210 nodes are mounted in the subrack
according to Figure 9 on page 12. The nodes can be mounted in different
ways see tables in section 3 on page 4.