
6. Step
As soon as the countdown is finished
and the signal has sounded you have
to pull the rocker lever towards the
handle.
7. Step
Now slew the sealing head to the left
while keeping the rocker lever pulled.
The welding process is finished, once the
indicator bar (1) is filled fully.
The cool down starts (2). After cool down
there is a beep and the display lights up
green.
The tensioning process is finished, once
the indicator bar is filled in fully.
Attention!
If after pressing the welding button,
the welding process does not start,
but the sealing head beeps, the
tension button was not pressed first.
Attention!
It is recommended to clean the
sealing head regularly (at least daily),
if there is a lot of strap waste.
Especially the tension wheel and the
tooth plate have to be checked for
damages and kept clean.
Please refer to section 10.10.
Fig. 78
Fig. 77
Fig. 76
Fig. 75
UK (Li)
-65-
Summary of Contents for 700X-Li
Page 115: ......
Page 116: ...EP105016...