950-032 D1C1 manual ver. E
ergonomic products • 198 Airport Rd • Fall River, MA 02720 • 866-374-6487
SRS Compact Cart
Model: D1C1
PAGE 31
STEP 1 - MAKING THE UMBILICAL CONNECTIONS
12 - UMBILICAL CONNECTIONS CONT’D
1. All of the utilities required by your Workstation
are supplied via the Umbilical Tube. Installation
simply involves plugging in tubing and electrical
connectors.
2. Refer to Fig 12.1 to get familiar with the
tubing and electrical connections (some options
shown, and may not be to the configuration of
your Workstation.).
3.
Be Careful not to cut or damage any of the
tubes and wires inside the umbilical tube.
Power cord
Optional
Tubing
Connector
9 Pin
Connector
Optional
Suction
Hose
USB Connection
Optional
Umbilical Tube
STEP 2 - CONNECTING THE 9 PIN AND TUBING CONNECTORS
Fig 12.1
1. Plug in 9 Pin Power Connector and
Tubing Connector as shown in Fig 12.2.
2. For proper orientation the 9 Pin Power
Connector wires black, yellow, and red
should be on top.
3. To plug and secure the Tubing Con-
nector move lever clockwise to install or
remove. Move counter clockwise to lock
in place.
9 Pin Power
Connector
Tubing
Connector
Fig 12.2