6
7
installation guide
To install the legs, thread the washer over the bolt of the leg
with the recessed side facing the leg, and tighten by hand.
Do not over tighten.
STEP 1
STEP 2
installation guide
Always use two people when setting up the base.
Place the bed base box in a desired location with the
bottom of the box facing up.
Remove the binding straps and packing materials, making
sure not to puncture the box with any sharp objects.
Remove the bed base from the box keeping the bottom of
the base facing upwards.
STEP 3
STEP 4
STEP 5
STEP 6
STEP 7
STEP 8
STEP 9
STEP 10
Uncoil input cord (connected to
control box’s power port) and plug
into Power Supply.
If installing a split unit - see pages 9-10.
To install headboard brackets (sold separately) see
instructions on page 11.
Locate the Backup Battery Pack and
install (4) 9 Volt batteries (not included).
Store the battery pack in a convenient
location for emergency use.
For
operating instructions see page 8.
Uncoil the Power Cord and connect to
the Power Supply. Place Power Supply
on the ground and extend from the
base. Ensure that the Power Supply and
all attached cords are directed toward
the desired surge protector.
Carefully flip the base over on to its legs. Important: Two
people are required to move the bed base. Do not drag
across the floor. Do not rest frame on its side, excessive
pressure may damage the legs.
Plug the power cord into a power source.
A surge protector
is recommended.
Ensure batteries are correctly installed in the back of the remote.
Quickly test functions to verify proper setup before placing
mattress on base. Return the base to a flat position before
placing the mattress on top.
Setup is now complete! Test all functions on remote.
Slide the left side of the mattress retainer bar into the
bracket. Pull the retainer bar to the opposite bracket and
secure the right side.
For customer support, visit www.ergomotion.us or call: 1-888-550-3746
For customer support, visit www.ergomotion.us or call: 1-888-550-3746