background image

JA07092020 

                                            

www.epvscreens.com 

                         

U

-00169   

Wall Installation 

Step 13: 

Measure the overall length and height of the frame and drill holes for the top brackets. Line up the wall 

brackets  with the  drilled  holes  on  the installation  location  and  screw them  in  using  a  Phillips  screwdriver.  If  not 

installing  into  a  structural  wood  stud,  use  a  hollow  wall  anchor  then  screw  in  the  M5x50  wood  screws  with  a 

screwdriver. Make sure the brackets are leveled. 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

Step 14

: Position the fixed frame screen onto the top wall brackets as shown below and push down at the center of 

the top of the frame to secure. 

 

 

 

For Technical Support or an EPV Screens contact in your area, visit 

www.epvscreens.com 

 

 

Model/Size 

X = Wall bracket 

distance 

X1 = Bracket hole 

distance 

Y = Top/Bottom Wall 

Bracket Height 

EF123HUST-DS2 

1400mm (55.12”) 

30mm (1.18”) 

1340mm (52.76”) 

 

Don’t lock the screw to the bottom. 

k. 

j. 

Summary of Contents for Dark Star UST 2 eFinity Series

Page 1: ...ll affect the quality and performance of the projection image Follow the instructions below to properly maintain the screen 1 The screen surface has a horizontal linear structure DO NOT wipe the scree...

Page 2: ...d Edge Trim Parts List Qty item 2 pcs Main Frame Parts Qty item 2 pcs Edge Trim Parts Part A vertical frame Part D Part B horizontal frame Part E Part C horizontal frame Part F 2 Hardware Parts List a...

Page 3: ...joints c d to the top and bottom sections of the vertical frame Once inserted connect the vertical sections to the horizontal frame sections Make sure all holes are in alignment and the frame pieces a...

Page 4: ...of the frame with the bottom end near the approximate center point of the frame and rotate it in at an angle so that both ends of the bar are in alignment with the groove Screen Material Step 7 Put on...

Page 5: ...spring to the hole located on the screen material s outer edge in the following order Begin by first attaching the center points on both vertical left right sides steps 1 2 Then the center points on b...

Page 6: ...dge trim frame pieces over each end of the frame Connect edge trim frames E F together using the Center Joints M4 a and secure with four of the M4x4 Screws m as show in Step 1 Repeat for other side On...

Page 7: ...aller Material Tip Proper Projector Placement for DarkStar UST 2 The DarkStar UST 2is exclusively for table mounted ultra short throw projectors Overhead placement or a standard projector will make th...

Page 8: ...se a hollow wall anchor then screw in the M5x50 wood screws with a screwdriver Make sure the brackets are leveled Step 14 Position the fixed frame screen onto the top wall brackets as shown below and...

Reviews: