background image

JA07092020 

                                            

www.epvscreens.com 

                         

U

-00169   

 
 
 
 
 
 
 
 
 
 
 
 

 

Frame Assembly 

Step 1

:  Place the included soft padded EPE sponge sheet on a clean area where the screen will be assembled. 

Step 2: 

Position the pieces of the frame on the EPE sponge in the arrangement shown below 

 

 

 

 

Step 3: 

Insert 

center joint (a/b) 

connectors into 

one-half of the horizontal frame (B/C)

 and secure with the 

M4x7 

screws (g)

 as shown in the illustration below.  

Tip: The center joint (b) with the larger diameter holes should be on top. 

 

Step 4: 

Connect the 

elbow joints (c/d)

 to the top and bottom sections of the vertical frame. Once inserted, connect 

the vertical sections to the horizontal frame sections. Make sure all holes are in alignment and the frame pieces are 

flush (no gaps). They should form perfect right angles.  

Tip: The elbow joint (d) with the larger diameter holes should be on top.

 

 

Item 

Parts List 

EF123H 

a. 

Center Joints- M4 (bottom position) 

b.

 

Center Joints-D5 (top position) 

c. 

Elbow Joints M4 (bottom position) 

d. 

Elbow Joints D5 (top position) 

g. 

M4x7 Screws  

32 

h. 

Spring 

104 

i. 

Spring Hook 

j. 

wall brackets 

k. 

Φ5x50 Wall Screws  

8

 

l. 

Hollow Wall anchors  

m. 

M4x4 Screws 

24 

n. 

Angle cover 

4

 

o.

 

Center Support Bar 

p.

 

White gloves 

q. 

Spring 

b. 

a. 

c. 

d. 

g.

b. 

a. 

d. 

c

Summary of Contents for Dark Star UST 2 eFinity Series

Page 1: ...ll affect the quality and performance of the projection image Follow the instructions below to properly maintain the screen 1 The screen surface has a horizontal linear structure DO NOT wipe the scree...

Page 2: ...d Edge Trim Parts List Qty item 2 pcs Main Frame Parts Qty item 2 pcs Edge Trim Parts Part A vertical frame Part D Part B horizontal frame Part E Part C horizontal frame Part F 2 Hardware Parts List a...

Page 3: ...joints c d to the top and bottom sections of the vertical frame Once inserted connect the vertical sections to the horizontal frame sections Make sure all holes are in alignment and the frame pieces a...

Page 4: ...of the frame with the bottom end near the approximate center point of the frame and rotate it in at an angle so that both ends of the bar are in alignment with the groove Screen Material Step 7 Put on...

Page 5: ...spring to the hole located on the screen material s outer edge in the following order Begin by first attaching the center points on both vertical left right sides steps 1 2 Then the center points on b...

Page 6: ...dge trim frame pieces over each end of the frame Connect edge trim frames E F together using the Center Joints M4 a and secure with four of the M4x4 Screws m as show in Step 1 Repeat for other side On...

Page 7: ...aller Material Tip Proper Projector Placement for DarkStar UST 2 The DarkStar UST 2is exclusively for table mounted ultra short throw projectors Overhead placement or a standard projector will make th...

Page 8: ...se a hollow wall anchor then screw in the M5x50 wood screws with a screwdriver Make sure the brackets are leveled Step 14 Position the fixed frame screen onto the top wall brackets as shown below and...