background image

JA07092020 

                                            

www.epvscreens.com 

                         

U

-00169   

 
 
 
 
 
Note (after all springs have been attached): 
Correct material installation

 – Corners of the screen material are properly wrapped around the corner edges of the 

frame and material is evenly tensioned and flat, creating a nicely taut surface. 

 
Incorrect material installation

 –The corners of the screen material are not properly wrapped along the edge of the 

frame leaving the material with unbalanced tension and an uneven finish. To correct, detach springs from material at 
the corner(s) where material does not lie flat along the edge of the frame, reposition the material so that it lies flat 
and wraps along the edge of the frame, and reattach springs to the material. 

 

Edge Trim Installation 

 

 

Step 10

: Place the edge trim frame pieces over each end of the frame. 

Connect edge trim frames (

E/F

) together using the 

Center Joints- M4(a)

 

and secure with four of the 

M4x4 Screws(m)

 

as show in 

Step 1

. Repeat for other side. 

Once both top and bottom edge trim frames have been connected, attach the vertical (left/right) sides edge trim 

frames (

D

) using the 

Elbow Joints M4 (c)

 

and secure with four 

M4x4 screws 

(

m

) on all corners, 

Step 2

.

  

 

Step 11

: Install the 

angle cover

 (

n.

) on each corner of the frame using the double-sided tape. 

 

 

 

 

 

 

 

To avoid ripples forming in the material it is imperative that all of the corners are properly wrapped around the 

edges as illustrated in the check mark diagrams. 

 

 

 

 

 

 

 

c. 

a. 

m. 

2. 

1. 

Tear off the double-sided tape. 

m. 

1. 

2. 

2. 

Attention: The back of the material has labels indicating the TOP and BOTTOM. The top edge trim piece with 

the logo should be installed at the top. The material is directional so it will not properly reflect if bottom side is 

projected on. 

 

n. 

Summary of Contents for Dark Star UST 2 eFinity Series

Page 1: ...ll affect the quality and performance of the projection image Follow the instructions below to properly maintain the screen 1 The screen surface has a horizontal linear structure DO NOT wipe the scree...

Page 2: ...d Edge Trim Parts List Qty item 2 pcs Main Frame Parts Qty item 2 pcs Edge Trim Parts Part A vertical frame Part D Part B horizontal frame Part E Part C horizontal frame Part F 2 Hardware Parts List a...

Page 3: ...joints c d to the top and bottom sections of the vertical frame Once inserted connect the vertical sections to the horizontal frame sections Make sure all holes are in alignment and the frame pieces a...

Page 4: ...of the frame with the bottom end near the approximate center point of the frame and rotate it in at an angle so that both ends of the bar are in alignment with the groove Screen Material Step 7 Put on...

Page 5: ...spring to the hole located on the screen material s outer edge in the following order Begin by first attaching the center points on both vertical left right sides steps 1 2 Then the center points on b...

Page 6: ...dge trim frame pieces over each end of the frame Connect edge trim frames E F together using the Center Joints M4 a and secure with four of the M4x4 Screws m as show in Step 1 Repeat for other side On...

Page 7: ...aller Material Tip Proper Projector Placement for DarkStar UST 2 The DarkStar UST 2is exclusively for table mounted ultra short throw projectors Overhead placement or a standard projector will make th...

Page 8: ...se a hollow wall anchor then screw in the M5x50 wood screws with a screwdriver Make sure the brackets are leveled Step 14 Position the fixed frame screen onto the top wall brackets as shown below and...

Reviews: