background image

030714-JA 

                 

www.elitescreens.com

 

 

Frame Assembly 

Note: Refer to the section “ Splicer Installation” if joining two or more frames. 

1.

 

Insert the center joint into one of the ½ horizontal frames and fasten it with the two 

M5x15 screws

 (H).   

2.

 

Insert the other ½ horizontal frame piece to the center joint and fasten also using two 

M5x15 screws

3.

 

Repeat steps 1 and 2 for assembling the second horizontal frame. 

 

 

                                                                  Push                                Push 

 

 

 

                                                                                   

 

 

 

 

4.

 

Insert and slide in one 

M6 screws

 

(G)

 through the channel located on the back each 

horizontal frame. 

 

 

 

 

 

 

 

 

 

 

 

 

5.

 

Insert the 

elbow joint (A)

 into each end of the 

horizontal frames

 

(B)

 as shown below. 

 

 

 

 

 

 

 

 

 

Horizontal long frame (B) 

Elbow Joint (A) 

Push

 

Elbow Joint 

(A) 

Place one 

M6 hex screw (G)

 in the center for attaching the 

center support bar (E)

 

Horizontal long frame

 

Face up 

M6 hex screws (G) 

 

Horizontal frame

 

Center Joints 

Top right Frame 

Top left Frame 

Summary of Contents for CineGrey 5D Edge Free

Page 1: ...st Please make sure all parts listed below are included before installation A Elbow joint x 4 pcs B Top Bottom horizontal fame x 4 pcs C Left Right vertical frame x 2 pcs D Center joints x 2 pcs E Cen...

Page 2: ...wo M5x15 screws 3 Repeat steps 1 and 2 for assembling the second horizontal frame Push Push 4 Insert and slide in one M6 screws G through the channel located on the back each horizontal frame 5 Insert...

Page 3: ...l short frames C into the elbow joint A 7 Join the remaining horizontal long frame B with the frame built in the previous steps as shown below Horizontal long frame B Vertical short frame C Horizontal...

Page 4: ...ound the edges 2 Carefully and gently place the assembled frame on top the screen material as shown below Make sure to not allow the angle edge of the frame to come in direct contact with the screen m...

Page 5: ...repeat the above steps so the frame is not exposed Note The black shaded part represents the velcro on the frame That Velcro end will ultimately attach with the other velcro end on the screen material...

Page 6: ...e and keep it within the edge Proceed in the following sequence below The key is to attach within the middle sections of 1 and 2 Then continue attaching the remaining unattached areas Repeat the same...

Page 7: ...to unsnap the material from the buttons on the corners Support bar installation 1 Position the center support bar E in the middle of the frame and align the hole on each end of the support bar with t...

Page 8: ...t up to scale and are for illustrations purposes only Note Improper installation will result in light loss and produce a dark image This is due to the projector s light reflecting in the wrong directi...

Page 9: ...fig 2 Then align and adjust the edge trim with the screen edge to make the four corners into a better joint Note please don t remove the tape on the trim and put the trim with Elite logo on the botto...

Page 10: ...meworks please insert twelve M6 screws into each vertical short frame each before completely assembling the frame See figure below for example 1 Layout the frame The two frameworks should be parallel...

Page 11: ...e M6 screws with the splicer 3 Join the frames together with the splicer and tighten the frame and splicer with M6X12 screws as shown in the figure below For a local Elite Screens contact or Technical...

Reviews: