background image

10 

030714-JA 

                 

www.elitescreens.com

 

Attention: the comparison of view size between the before and after installing the trim strip, take 100H&120H as 

examples as the following shown.   

100H comparison: 

                                                                                                     

 

 

 

 

 

120H comparison 

 

 

 

 

 

 

Splicer Installation (sold separately)

 

If  you  want  to  joint  two  frameworks,  please  insert  twelve 

M6  screws

  into  each  vertical  short  frame  each  before 

completely assembling the frame. See figure below for example. 

 

 

 

                   

     

 

 

 

1.

 

Layout the frame:   

The two frameworks should be parallel and aligned as shown below. 

push 

M6 screws x 24pcs 

X

24PCS

 

Splicer x 3 PCS 

M6X12 screws x 24 PCS 

Parts list for 

splice option: 

 

Vertical (short) frame 

Before installing the trim strip 

After installing the trim strip 

 

After installing the trim strip 

 

Before installing the trim strip 

Summary of Contents for CineGrey 5D Edge Free

Page 1: ...st Please make sure all parts listed below are included before installation A Elbow joint x 4 pcs B Top Bottom horizontal fame x 4 pcs C Left Right vertical frame x 2 pcs D Center joints x 2 pcs E Cen...

Page 2: ...wo M5x15 screws 3 Repeat steps 1 and 2 for assembling the second horizontal frame Push Push 4 Insert and slide in one M6 screws G through the channel located on the back each horizontal frame 5 Insert...

Page 3: ...l short frames C into the elbow joint A 7 Join the remaining horizontal long frame B with the frame built in the previous steps as shown below Horizontal long frame B Vertical short frame C Horizontal...

Page 4: ...ound the edges 2 Carefully and gently place the assembled frame on top the screen material as shown below Make sure to not allow the angle edge of the frame to come in direct contact with the screen m...

Page 5: ...repeat the above steps so the frame is not exposed Note The black shaded part represents the velcro on the frame That Velcro end will ultimately attach with the other velcro end on the screen material...

Page 6: ...e and keep it within the edge Proceed in the following sequence below The key is to attach within the middle sections of 1 and 2 Then continue attaching the remaining unattached areas Repeat the same...

Page 7: ...to unsnap the material from the buttons on the corners Support bar installation 1 Position the center support bar E in the middle of the frame and align the hole on each end of the support bar with t...

Page 8: ...t up to scale and are for illustrations purposes only Note Improper installation will result in light loss and produce a dark image This is due to the projector s light reflecting in the wrong directi...

Page 9: ...fig 2 Then align and adjust the edge trim with the screen edge to make the four corners into a better joint Note please don t remove the tape on the trim and put the trim with Elite logo on the botto...

Page 10: ...meworks please insert twelve M6 screws into each vertical short frame each before completely assembling the frame See figure below for example 1 Layout the frame The two frameworks should be parallel...

Page 11: ...e M6 screws with the splicer 3 Join the frames together with the splicer and tighten the frame and splicer with M6X12 screws as shown in the figure below For a local Elite Screens contact or Technical...

Reviews: