Epson WF-7620/7610/7110 Series
Revision B
Disassembly/Reassembly
Routing FFCs/cables
51
Confidential
PE Sensor
Route the PE Sensor cable as follows.
1. Route through the hooks (x3) on the Main Frame Unit.
2. Route through the hooks (x2) and dowel on the Frame Base 1st, and install the Main Frame Unit to the Frame Base 1st.
Main Frame Unit
Hook
Dowel
PE Sensor Cable
Frame Base 1st
PE Sensor
Main Frame Unit's bottom
PE Sensor cable
CR Motor
Insert the ferrite core into the position shown above.
Route the CR Motor cable through the hooks (x8) shown above.
Hook
CR Motor cable
Ferrite core
130-digit side
0-digit side
CR Motor
Scanner Housing Upper Assy (WF-7110 Series)
Pull out the Cover Open Sensor cable from the hole on the Housing Upper
Assy, and route it through the rib.
Thread the Panel FFC through the ferrite core holder and ferrite cores (x2)
when routing the FFC.
Secure the ferrite core to the position shown above with double-sided tape.
Ferrite core
Ferrite core Holder
Housing Upper Assy
Cover Open Sensor cable
Hole
Panel FFC
Rib
Double-
sided tape
Ferrite core
Ferrite core Holder
Summary of Contents for WF-7110 Series
Page 8: ...5 2 Protection for Transportation 86 5 2 1 Securing the CR Unit 86 ...
Page 9: ...Confidential CHAPTER 1 TROUBLESHOOTING ...
Page 23: ...Confidential CHAPTER 2 DISASSEMBLY REASSEMBLY ...
Page 52: ...Confidential CHAPTER 3 ADJUSTMENT ...
Page 75: ...Confidential CHAPTER 4 MAINTENANCE ...