Epson WF-7620/7610/7110 Series
Revision B
Disassembly/Reassembly
Routing FFCs/cables
49
Confidential
Main Board Unit (1)
Route the following cables as follows.
(For the correspondence between the cables, FFCs and the connectors on the Main Board, see
.
•
Power Supply Unit cable (CN501):
Connect to their connectors on the Main Board.
PF Motor cable (CN7)
APG Sensor cable(CN59)
Relay Board FFC (CN44)
PIS FFC (CN45)
Head FFC (CN41, 42, 43)
•
PE Encoder Sensor FFC (CN51):
Pull out from the backside of the Main Board Unit and route according to its folds, then connect to the
connector on the Main Board.
•
PE sensor cable(CN52):
Set the ferrite core into the space shown above, and route through the groove, rib C, and rib D (x4) on
the Frame Base 1st, then connect to the connector on the Main Board.
•
CR Motor cable(CN30):
Route through the rib B (x3) and rib C on the Frame Base 1st, then connect to the connector on the Main
APG Motor cable(CN34)
Board.
•
Paper Stopper Sensor cable(CN55):
Route through the rib A (x2), rib C, and rib D (x4) on the Frame Base 1st, then connect to the
ASF PE Sensor cable(CN56)
connector on the Main Board.
•
Grounding Wire A:
Route through the rib A (x2), hooks (x3), rib B (x3) on the Frame Base 1st, and secure to the position
shown above with the screw.
For WF-7620/WF-7110 Series, route the FFC and cables from the Frame Base 2nd Assy as follows.
•
Frame Base 2nd Assy Paper Stopper sensor cable(CN57): Connect to their connectors on the Main Board.
ASF Motor cable (CN35)
ASF Encoder Sensor FFC (CN54)
•
Grounding Wire B:
Route inside the rib C on the Frame Base 1st, and secure together with the grounding wire A to the
position shown above with the screw.
CN501
CN7
CN45
CN51
CN52
CN30
CN34
CN55
CN56
Grounding Wire A/B
Frame Base 1st
Rear
CN41
CN42
CN43
CN35
Only WF-7620/WF-7610 Series
CN54
CN57
Wall of Frame Base 1st:
Put the excess portion of
cables inside this wall.
CN59
CN44
Main Board Unit
Rib A
Rib B
Rib C
Rib D
Hook
Groove
C.B.S-TITE SCREW 3x6 F/ZN-3C (8±1 kgf
·
cm)
Main Board Unit (2)
The correspondence between Main Board and cables/FFCs is given above.
CN5
CN44
CN60
CN71
CN59
CN70
CN501
CN34
CN73
CN74
CN51
CN35
CN54
CN31
CN30
CN76
CN32
CN52
CN72
CN33
CN57
CN56
CN55
CN45
CN9
CN21
CN53
CN#
名称
CN#
名称
CN5
FAX FFC*
1
CN56
ASF PE Sensor cable*
2
CN9
Wireless LAN Module cable
CN57
Frame Base 2nd Assy Paper
Stopper sensor cable*
2
CN20
Panel FFC
CN30
CR Motor cable
CN59
APG Sensor cable
CN31
PF Motor cable
CN60
Duplex Unit Cover Open
Sensor cable
CN32
Scanner Motor cable*
1
CN33
ADF motor cable*
1
CN70
Scanner FFC*
1
CN34
APG motor cable
CN71
ADF PE Sensor cable*
1
CN35
ASF motor cable*
2
CN72
ADF document sensor
cable*
1
CN41
Head FFC
CN42
Head FFC
CN73
ADF encoder sensor
cable*
1
CN43
Head FFC
CN44
Relay Board FFC
CN74
Scanner Open Sensor
cable*
1
CN45
PIS FFC
CN51
PF Encoder Sensor FFC
CN76
Paper Support Encoder
Sensor cable*
1
CN52
PE Sensor cable
CN53
Cover Open Sensor cable
CN77
ADF plunger cable*
1
CN54
ASF Encoder Sensor FFC*
2
CN501
Power Supply Unit cable
CN55
Paper Stopper sensor cable
Note "*1": Only WF-7620/WF-7610 Series
"*2": Only WF-7620/WF-7110 Series
CN42
CN43
CN41
Rear
Relay Board FFC
Route the Relay Board FFC as follows.
1. Connect the FFC to the connector (CN2) on the Relay Board Assy and route it through the hook, then secure it to the position shown above with double-
sided tape.
2. Attach the Waste Ink Tray Cover, and pull out the FFC from the inside of the rib on the Waste Ink Tray Cover.
3. Attach the Relay Board FFC Guide, and route the FFC through the ribs (x4) on the guide and secure the FFC to the position on the guide shown above with
double-sided tape (x2).
4. Route the FFC along the standard line on the Main Frame Unit, and secure the FFC to the position on the Main Frame Unit shown above with double-sided tape (x3).
Step2,3
Relay Board FFC Guide
Waste Ink Tray Cover
Step1
Waste Ink Tray Holder
Relay Board FFC Assy
Relay Board FFC
Step4
Hook
Standard line
Rib
Double-sided tape
Main Frame Unit
Summary of Contents for WF-7110 Series
Page 8: ...5 2 Protection for Transportation 86 5 2 1 Securing the CR Unit 86 ...
Page 9: ...Confidential CHAPTER 1 TROUBLESHOOTING ...
Page 23: ...Confidential CHAPTER 2 DISASSEMBLY REASSEMBLY ...
Page 52: ...Confidential CHAPTER 3 ADJUSTMENT ...
Page 75: ...Confidential CHAPTER 4 MAINTENANCE ...