Confidential
Revision Status
Revision
Date of Issue
Description
A
July 31, 2012
First Release
B
September 6, 2012
Chapter 1
"1.1.1 Troubleshooting Workflow (p9)"
Chapter 2
"2.1.4 Standard Operation Time for Servicing the Product (p22)"
"2.1.5 Checks and Precautions before Disassembling (p25)"
"2.2 Disassembly/Reassembly Procedures (p30)"
"2.3 Detailed Disassembly/Reassembly Procedure for each Part/Unit (p40)"
"2.4 Routing FFCs/cables (p49)"
Chapter 3
"3.1 Required Adjustments (p53)"
"3.3.1 Checking the Platen Gap (p60)"
"3.3.2 CR/PF Belt Tension Check (p62)"
Chapter 5
"5.2 Points to be checked before packing the printer (p73)"