EH-TW3500/4500/5500
Disassembly and Assembly
CONFIDENTIAL
SEIKO EPSON
80
Revision A
3.3.9.3 CF Frame
1.
Remove the Lamp.
2.
Remove the Side Cover L/Side Cover R.
3.
Remove the Upper Case (assembly).
4.
Remove the MA Board (assembly).
5.
Remove the DR Board (EH-TW4500/5500 series only).
6.
Remove the Optical Engine (assembly).
7.
Remove the two screws and remove the CF Switch, LG Spring and the CF Plate
(EH-TW4500/5500 series only). (In EH-TW4500/5500 series’s case, remove the
GND cable (2) screwed together.)
8.
Remove the ML Fasten Spring from the CF Switch.
9.
Remove the CF Frame.
Figure 3-29.
Standard Operation Time
16 Min.
LG Spring
CF Frame
CF Switch
Optical Engine
(assembly)
ML Fasten Spring
C.B.P-TITE SCREW,3X10,F/ZB-3C
CF Plate
(EH-TW4500/5500 series only)
GND cable (2)
EH-TW4500/5500 series
Summary of Contents for DREAMIO EH-TW2900
Page 1: ...EH TW2900 3500 4400 4500 5500 Multimedia Projector SERVICE MANUAL CONFIDENTIAL ...
Page 9: ...CONFIDENTIAL C H A P T E R 1 PRODUCTDESCRIPTION ...
Page 16: ...CONFIDENTIAL C H A P T E R 2 TROUBLESHOOTING ...
Page 46: ...CONFIDENTIAL C H A P T E R 3 DISASSEMBLYANDASSEMBLY ...