
20
Light CTime Model 2
Work Time1 (T1)
Load working period after light control turns ON
load.
Work Time2 (T2)
The running hour of the load after the end of the
work time 1.
Work Time3(T3)
Load working period before light control turns off
load.
Night Time
The controller calculated the total length of the
night by self-learning. The time should be more than
3 hours.
Light CTime2 Model diagram
Summary of Contents for SPP-01
Page 25: ...23 6 SPP 01 Overall Dimension...