
12
Step 1: Wiring
The recommended connection order has been provided as Figure3-2
indicated. Be sure the positive and negative polarity is correct and all
terminals are tightened.
Figure 3-2 System wiring review
Step 2: Confirm power on
When battery power is applied and the controller starts up, the battery
LED indicator will be green. If the controller doesn't start up, or the
battery status LED error exists, please refer to section 5 for
troubleshooting.
Fuse
Battery
Fuse
Solar Module
1
1
3
2
1
1
Load
-
+
+
+
-
-
Summary of Contents for LS0512R
Page 2: ......
Page 36: ...Dimensions 25 0 98 97 3 82 86 3 39 44 1 73 66 2 6 mm inches ...
Page 37: ......
Page 38: ...Version number V6 0 ...
Page 39: ......