background image

 

Fig 5b. BExCS110-05D AC Simplified Block Diagram for 

independent operation (negative switching) 

 

 

Fig 6a. BExCS110-05D AC Simplified Block Diagram for 

simultaneous operation (positive switching) 

 

 

Fig 6b. BExCS110-05D AC Simplified Block Diagram for 

independent operation (positive switching) 

 
 

13.2  

Stage Switching 

 

13.2.1 

Units First Stage Tones 

 

Stage one (S1) Operation 

 

Simply connect the supply 
voltage to the + and - 
supply terminals, (see fig. 
6). 

 

13.2.2   DC Units Second and Third Stage Tone 
Selection 

 

For units set up for –ve switching (default setting): 

 

Stage two (S2) Operation

 

 

Power +ve and –ve, link a -
ve supply line to the S2 
terminal.  
Dip switch alters stage 2 
tone. 

Stage three (S3) Operation 

 

Power +ve and –ve, link a -
ve supply line to the S3 
terminal.  
Dip switch alters stage 3 
tone. 

 

 
 

For units set up for +ve switching (refer to 13.3): 

 

Stage two (S2) Operation

 

 

Power +ve and –ve, link a 
+ve supply line to the S2 
terminal.  
Dip switch alters stage 2 
tone. 

Stage three (S3) Operation 

 

Power +ve and –ve, link a 
+ve supply line to the S3 
terminal.  
Dip switch alters stage 3 
tone. 

 

 

Fig. 6a DC Terminals 

 

 

Fig. 6b Beacon DC Terminals 

 

13.3 

Stage Switching Polarity (DC Units 
Only) 

 

The BExCS110-05D DC sounders has the facility to use 
ve or –ve switching to change the tone to the second 
and third stages. Negative switching is the default setting. For 
–ve switching connect the two headers on the pcb to the left-
hand (marked –ve) and centre pins. For +ve switching 
connect the headers to the right hand (ve) and the 
centre pins. (Refer to Fig. 7) 

Volume Control 

DIP Switch 

DC Terminals 

Stage Headers 

S2
S3

+

 

 

 

+  

 

Flip / Flop 
Pin Header 

Interconnecting Terminals 
to sounder PCB 
(simultaneous 
mode of operation) 

www.acornfiresecurity.com

www.acornfiresecurity.com

Summary of Contents for BExCS110-05D-P DC012

Page 1: ...e gas air mixture likely to occur in normal operation Zone 2 Explosive gas atmosphere not likely to occur in normal operation but may be present for short periods Gas Groupings Group IIA Propane Group...

Page 2: ...the unit The BEx combined sounder beacon should be secured to any flat surface using the three 7mm fixing holes on the stainless steel U shaped mounting bracket See Figure 1 The required angle can be...

Page 3: ...o the M20 entries Any other adapters used must be suitably rated and ATEX IECEx certified adapters 10 Earthing Both AC and DC combined sounder beacon units must be connected to an earth The units are...

Page 4: ...hing 12 2 1 Units First Stage Tones Stage one S1 Operation Simply connect the supply voltage to the L and N supply terminals see fig 4 12 2 2 AC Units Second and Third Stage Tone Selection To select t...

Page 5: ...age 3 tone For units set up for ve switching refer to 13 3 Stage two S2 Operation Power ve and ve link a ve supply line to the S2 terminal Dip switch alters stage 2 tone Stage three S3 Operation Power...

Page 6: ...unit should be used to link the supply from the interconnecting terminals on the beacon board down to the supply terminals on the sounder board 15 Settings 15 1 Tone Selection The sounders have 32 di...

Page 7: ...n the order shown in figure 12 Fig 13 Cover and Guard Fixtures 17 Maintenance Overhaul Repair Maintenance repair and overhaul of the equipment should only be carried out by suitably qualified personne...

Page 8: ...e 5 15 Continuous at 800Hz 0 1 1 1 0 Tone 2 Tone 5 16 Intermittent 660Hz 150mS on 150mS off 1 1 1 1 0 Tone 18 Tone 5 17 Alternating 544Hz 100mS 440Hz 400mS 0 0 0 0 1 Tone 2 Tone 27 18 Intermittent 660...

Reviews: