background image

to dress the wires so that when the cover is inserted into the 
chamber the wires do not exert excess pressure on the 
terminal blocks. This is particularly important when using 
cables with large cross sectional areas such as 2.5mm². 

 

12) AC Wiring 

 

A 2-way terminal block is provided on the AC Sounder for 
power. There are 1-off Live and 1-off Neutral terminals in 
total. A 3-way terminal is provided  for stage switching. There 
are 1-off stage 2, 1-off stage 3 and 1-off common terminals in 
total. A 4-way terminal block is provided on the AC beacon 
for power. There are 2-off Live and 2-off Neutral terminals in 
total.  

 

12.1 Wiring 

Diagrams 

 

Fig 3a. BExCS110-05D AC Simplified Block Diagram for 

simultaneous operation 

 

 

Fig 3b. BExCS110-05D AC Simplified Block Diagram for 

independent operation 

 

12.2  Sounder Stage Switching 

 

12.2.1 

Units First Stage Tones 

 

Stage one (S1) Operation 

 

Simply connect the supply 
voltage to the L and N supply 
terminals, (see fig. 4). 

 

 

12.2.2   AC Units Second and Third Stage Tone 

Selection 

 

To select the second and third stage tones on the BExCS110 
AC sounder. 

 

Stage two (S2) Operation 

 

Power L and N, link the 
Common-C and S2 terminal.  
Dip switch alters stage 2 
tone.

 

 
 
 

Stage three (S3) Operation 

 

Power L and N, link the 
Common-C and S3 
terminals.  
Dip switch alters stage 3 
tone. 

 

 

 

Fig. 4a Sounder AC Terminals 

 

 

 

Fig. 4a Beacon AC Terminals 

 

13) DC Wiring 

 

A 4-way terminal block is provided on the DC Sounder. There 
are 1-off +ve, 1-off -ve, 1-off stage 2 and 1-off stage 3 
terminals in total. 

 

13.1 Wiring 

Diagrams 

 

Fig 5a. BExCS110-05D AC Simplified Block Diagram for 

simultaneous operation (negative switching) 

DIP Switch 

Volume Control 

Stage 

Terminals 

AC 

Terminals 

S2 

 

S3 

 

 

N  

 

 

 

N  

 

Interconnecting Terminals 
to sounder PCB 
(simultaneous 
mode of operation) 

Flip / Flop 
Pin Header 

www.acornfiresecurity.com

www.acornfiresecurity.com

Summary of Contents for BExCS110-05D-P DC012

Page 1: ...e gas air mixture likely to occur in normal operation Zone 2 Explosive gas atmosphere not likely to occur in normal operation but may be present for short periods Gas Groupings Group IIA Propane Group...

Page 2: ...the unit The BEx combined sounder beacon should be secured to any flat surface using the three 7mm fixing holes on the stainless steel U shaped mounting bracket See Figure 1 The required angle can be...

Page 3: ...o the M20 entries Any other adapters used must be suitably rated and ATEX IECEx certified adapters 10 Earthing Both AC and DC combined sounder beacon units must be connected to an earth The units are...

Page 4: ...hing 12 2 1 Units First Stage Tones Stage one S1 Operation Simply connect the supply voltage to the L and N supply terminals see fig 4 12 2 2 AC Units Second and Third Stage Tone Selection To select t...

Page 5: ...age 3 tone For units set up for ve switching refer to 13 3 Stage two S2 Operation Power ve and ve link a ve supply line to the S2 terminal Dip switch alters stage 2 tone Stage three S3 Operation Power...

Page 6: ...unit should be used to link the supply from the interconnecting terminals on the beacon board down to the supply terminals on the sounder board 15 Settings 15 1 Tone Selection The sounders have 32 di...

Page 7: ...n the order shown in figure 12 Fig 13 Cover and Guard Fixtures 17 Maintenance Overhaul Repair Maintenance repair and overhaul of the equipment should only be carried out by suitably qualified personne...

Page 8: ...e 5 15 Continuous at 800Hz 0 1 1 1 0 Tone 2 Tone 5 16 Intermittent 660Hz 150mS on 150mS off 1 1 1 1 0 Tone 18 Tone 5 17 Alternating 544Hz 100mS 440Hz 400mS 0 0 0 0 1 Tone 2 Tone 27 18 Intermittent 660...

Reviews: