Location Consideration
The
POWER
BOOST unit should be installed in a dry, well- ventilated area where it is not exposed to
extreme temperature or frost.
Reasonable access to all parts of the set and adequate service work space must be provided.
Provision for lifting equipment is recommended for units incorporating large pumps. There should
ideally be adequate lighting in the location of the
POWER
BOOST unit for ease of maintenance.
All system pipe work should be aligned and self supporting preventing any strain or distortion
within the unit. All pipe work that may be exposed to freezing conditions should be fully protected.
Provision should be made for the disposal of water drained from the system.
Foundation & Mounting
The
POWER
BOOST unit must be mounted on a solid foundation to support the weight of the unit.
Surfaces must be firm and level in all directions, the recommended surface is a concrete plinth or
floor and points are provided for floor fixing if desired. Isolation mounts are provided and should
be fitted if required.
Outlet Manifold
NB:
Pipe Work connections can be made to either end of the inlet & outlet Manifold to suit your
site layout. Blanking Caps are supplied loose to close any open ends.
Installation Information & Diagrams
3.
0
General Notes
ALL ITEMS TO BE TAGGED WITH EPS TAG STATING;
EPS, DRAWING No, PURCHASE ORDER No.
1st ANGLE
PROJECTION
FOR HANDRAIL DETAILS SEE EPS DRAWING;
EPS/A-L/HANDRAILING/RAILFAB.
REMOVE ALL SHARP EDGES AND BURRS
IF IN DOUBT ASK DO NOT SCALE OFF THIS DRAWING
Drawn By:
Cost Code:
Checked By:
Date:
Revision Suffix:
Drawing No.:
Job No.:
Drawing Title:
Scale:
reproduced in any form without the prior written consent of E.P.S. Pumping & Treatment Systems.
This drawing is protected by copyright and must not be
022-31250
022-31200
Quartertown Industrial
Co. Cork.
Job Title:
Email:
Phone:
Fax:
Mallow,
Estate,
COPYRIGHT
094-9630761
094-9630226
Mountrath, Co. Laois.
Ballyhaunis, Co. Mayo.
0502-32518
0502-32279
Fax:
Phone:
Phone:
Fax:
Qty
Item No.
Material
Finish
NOTES
2.
4.
1.
BOOSTER SETS
POWERBOOST FLOW-V
CR RANGE
LC0000046
*PB0010*
*PB0010*
TOS
27/05/2016
LC0000046
Sheet 1 of 2
N.T.S.
1 2 3
FINISH:
MATERIAL :
ELEVATION
Inlet Manifold