background image

4

POWER

BOOST

by EPS Group

Installation Checklist

1. 

Check the unit for any visual defects. Contact your supplier immediately if any are found.

2. 

Choose a suitable location for installation. Please ensure the unit is fitted in accordance 

with these instructions.

3. 

Connect the inlet and outlet pipe work as per the installation diagram.

• 

The 

POWER

BOOST Unit is designed to be gravity fed from a cold water storage 

tank.

• 

The inlet pipe work should be sized according to minimise friction & turbulence 

maintaining a suction velocity of less than 2m/s and in any case should be at least 

the size of the inlet manifold.

• 

Good quality full bore Isolation Valves should be fitted before and after the unit to 

allow for reliable service or repair.

4. 

Fit the supplied pressure vessel to the discharge manifold (See Page 7).

5. 

In accordance with the latest IEE regulation all electrical connections should be carried 

out by a qualified electrician. The booster unit must be earthed. It is recommended that a 

residual current device (RCD) is fitted on the incoming electrical supply.

6. 

Once all mechanical and electrical connections have been made the following steps 

should be followed before the unit is powered up:

• 

Fully close all isolation valves on the outlet side of the booster set;

• 

Ensure there is sufficient water in the supply tank;

• 

Fully open all isolation valves on the inlet side of the booster set;

• 

Open bleed screw at the top of each pump in turn and fully de-aerate the pumps.

Summary of Contents for POWERBOOST FLOW V Series

Page 1: ...POWERBOOST Clean Water Booster Sets Flow Range O M Manual...

Page 2: ...ontents General 3 Installation Checklist 4 Location Consideration 5 Installation Information Diagrams 5 Commissioning 6 Pressure Vessel 7 Pump Speci cation 8 Controller Speci c Instructions Troublesho...

Page 3: ...t commercial pressure boosting The POWERBOOST unit should not be installed in areas that are classified as hazardous or where there is a risk of an explosion or harm to people The manufacturer does no...

Page 4: ...solation Valves should be fitted before and after the unit to allow for reliable service or repair 4 Fit the supplied pressure vessel to the discharge manifold See Page 7 5 In accordance with the late...

Page 5: ...olation mounts are provided and should be fitted if required Outlet Manifold NB Pipe Work connections can be made to either end of the inlet outlet Manifold to suit your site layout Blanking Caps are...

Page 6: ...rotected by a suitable MCB or fuse Wiring Connections The POWERBOOST unit has provision for an external level switch input and a volt free general alarm output BMS connection Connections for these fea...

Page 7: ...oster unit if required Pressure Vessel Theairpre chargeinthepressurevesselshouldbeset65 ofthepre setworkingpressureformaximum e ectiveness It is recommended to check the tank air pressure every 4 6 mo...

Page 8: ...00V Cut In System Pressure Flow Pressure 4CR80 0 55 0 75 3 4 2 2 3 80 5 2 5CR80 0 75 1 4 3 2 5 3 4 80 6 7 4CR100 0 75 1 4 5 2 6 2 3 100 5 0 5CR100 1 1 1 5 4 2 2 4 3 4 100 6 3 4CR200 1 5 2 7 3 4 2 3 4...

Page 9: ...Steadypres Light Signals Steadypres Keyboard ON OFF BLINKING STATUS POWER STEADYPRES does not detect power supply WARNING cannot guarantee the absence of power supply the electronic board may be faul...

Page 10: ...te and the inverter re starts in automatic mode HIGH TEMP BOX Only T T models The temperature inside the inverter has reached 65 C is automatically limited the maximum frequency of 5 Hz but the drive...

Page 11: ...llowing documents ISO 12100 Safety of machinery General principles for design Risk assessment and risk reduction I hereby declare that the equipment above has been designed assembled and tested to com...

Page 12: ...POWERBOOST byEPSGroup IRL NI powerboost ie info powerboost ie 094 963 3500 IRL 028 9181 8347 NI UK power boost co uk info power boost co uk 01543 415200...

Reviews: