
System inspection and maintenance
PE
CON+
®
www.epa.de
47
of
48
10
System inspection and maintenance
The function must be checked regularly.
The test key can be used to check whether the protective earth is interrupted.
WARNING
These tests must be carried out by a qualified electrician who is competent to carry out
the tests, has experience of testing and possesses a knowledge based on the testing
of comparable systems.
For the initial test of electrical systems and stationary equipment, the requirements of
the standard DIN VDE 0100-600 "Low-voltage electrical installations – Part 6:
Verification" must be met.
For the repeat test of electrical systems and stationary equipment, the requirements of
the standard DIN VDE 0105-100 "Operation of electrical installations – Part 100:
General requirements" must be met.
Always follow the DGUV Accident Prevention Regulations.
IMPORTANT NOTE
Inspection or maintenance should only be carried out by qualified electricians.
Unless explicitly described in these operating instructions, modifications to the device
may only be carried out by EPA or persons authorised by EPA.
Summary of Contents for PECON+
Page 2: ......
Page 11: ...Important basic information PECON www epa de 9 of 48 1 10 Declaration of Conformity...
Page 51: ......