2. Commissioning
2.1Using the Reach Truck for the First Time
Only operate the Reach Truck with battery current.
Preparing the Reach Truck for operation after delivery or transport.
Procedure
• Check the equipment is complete.
• Check the hydraulic oil level.
• Install the battery if necessary (where required), (see 4.3 Battery removal and
installation" ) do not damage battery cable.
• Charge the battery, (see 4.2 Charging the battery" ).
When the Reach Truck is parked the surface of the tyres will flatten. The flattening will
disappear after a short period of operation.
2.2During brake-in
We recommended operating the machine under light load conditions for the first stage
of operation to get the most from it. Especially the requirements given below should
be observed while the machine is in a stage of 100 hours of operation.
• Must prevent the new battery from over discharging when early used. Please
charging when remain power less than 20%.
• Perform specified preventive maintenance services carefully and completely.
• Avoid sudden stop, starts or turns.
• Oil changes and lubrication are recommended to do earlier than specified.
• Limited load is 70
~