Checklist
energiSava 250 installation instructions have been understood
Ductwork is Ø125mm or larger with no more than 10% flexi used (90%
ridged)
All ducts, vents and diffusers are securely connected & sealed, with supply
and extract filters in place
The unit is securely fixed into position with enough space left for servicing
Condense drain is tight, drains to a suitable location and has been water
tested
All major building works have been completed prior commissioning
Supply and extract have been commissioned to meet Part F of the Building
Regulations with a calibrated anemometer
Commissioning data has been recorded
Inform building owner/user on how to operate and maintain the system
These checks are required to ensure the proper function of this unit.