![Enviro Westport IPI Steel Owner'S Manual Download Page 17](http://html1.mh-extra.com/html/enviro/westport-ipi-steel/westport-ipi-steel_owners-manual_2415819017.webp)
16
17
Maintenance And Service
F
ueL
c
onveRsion
:
TO BE INSTALLED BY A QUALIFIED SERVICE AGENCY ONLY
Please read and understand these instructions before installing.
Warning: This conversion kit shall be installed by a qualified service agency in accordance
with the manufacturer’s instructions and all applicable codes and requirements of the
authority having jurisdiction. If the information in these instructions is not followed
exactly, a fire, explosion or production of carbon monoxide may result causing property
damage, personal injury or loss of life. The qualified service agency is responsible for
the proper installation of this kit. The installation is not proper or complete until the
operation of the converted appliance is checked as specified in the manufacturer’s
instructions supplied with the kit.
Kit Parts List for all Westport IPI models:
1 - Orifice (NG: #39) or (LP: #53)
1 - Servo Regulator with diaphragm
1 - Installation instruction sheet
2 - Conversion labels
Carefully inspect all parts supplied with this conversion kit. If any parts have been damaged or are
missing, contact your dealer, distributor or courier company to have them replaced before starting this
installation.
Conversion Kit Installation:
1. Turn the unit off by pressing the ON/OFF Key on the remote and shut off gas supply at the shut-off
valve upstream of the unit. CAUTION: The gas supply must be shut off prior to disconnecting the
electrical power and before proceeding with the conversion. Allow the valve and unit to cool down
to room temperature.
2. Remove the glass door as shown in the
M
aIntenance
and
s
ervIce
- g
lass
d
oor
r
eMoval
section of the
Owner’s Manual.
3. Carefully remove the log set, and media.
4. Remove the burner as shown in the
M
aIntenance
and
s
ervIce
- b
urner
r
eMoval
section of the Owner’s
Manual.
5. Convert the pilot (see Figure 1):
a) Using a
7
/
16
” wrench, turn the pilot head a
1
/
4
turn counter-clockwise
b) Push the slider with your finger or
flat head screwdriver
- Natural Gas is marked NAT.
- Propane gas is marked LP with an indicating hole
between L and P. It is also marked red.
c) Turn the pilot head a
1
/
4
turn clockwise
back to its original position.
Figure 1. Pilot Slider set to LP
Summary of Contents for Westport IPI Steel
Page 50: ...Notes 50...