Secondary Installation
Figure 54. Fourth Stage Log Set Installation.
Figure 53. Third Stage Log Set Installation.
Step 3
: Install the big y shaped
twig on the far left side by locating
the bottom of it on the far left log
grate upright. The twig should run
parallel with the side of the fi rebox
and the top will rest on the top of
the ember bed. Then install the
big, slightly curved twig on the far
right side by locating the bottom of
it on the far right log grate upright.
The top will rest on the smooth
section of the middle ember bed
twig.
Step 4
: Next, install the second
small twig between the two right
side log grate uprights by locating
the notch on the bottom side with
with cross bar of the log grate.
Then install the medium sized
straight twig between the center
and right side log grate upright by
locating the notch on the bottom
side with the log grate cross bar.
The top of the twig will rest on the
middle ember bed twig
42