background image

11

                              PARTS LIST                                                                      

A

6

7

2

5

1

3

4

8

Sensor Detail A

9

10

11

Part No.

Description

Replacement No.

1

HDK Back Assembly

2

HDK Front Assembly

3

Lid Gasket

4

Cabinet Side Extention

5

Duct Shield

6

Slider Grill

7

Grill

8

Sensor Assembly

9

High Limit Sensor  (220F) EC-002

10

Fan Sensor            (120F) EC-001

11

Control Sensor       (175F) 50-2888

EF-208

50-2887
50-2886

Summary of Contents for Maxx-1

Page 1: ...IRE MANUAL BEFORE INSTALLATION AND USE OF THIS PELLET BURNING ROOM HEATER FAILURE TO FOLLOW THESE INSTRUCTIONS COULD RESULT IN PROPERTY DAMAGE BODILY INJURY OR EVEN DEATH CONTACT YOUR LOCAL BUILDING O...

Page 2: ...not have combustible materials touching outlet registers Give wall registers at least 6 inches of clearance to furniture clothing ect Do place anything directly above or in contact with oor registers...

Page 3: ...sides by opening rebox and ash pan door handles and loosen three 8 T 20 mounting screws on each side of stove Loosen Loosen Loosen Loosen Figure 1 Adjustment knob and lock collar removal Figure 2 Cab...

Page 4: ...Front Grill assembly four T 20 screws Figure 3 Cabinet sides removal Figure 4 Original front gill removal 5 Remove Front Top assembly four screws Figure 5 Front Top assembly removal 6 Remove four scre...

Page 5: ...et removal Figure 8 Front HDK assembly install 9 Install Back HDK assembly rst attach back plate using original hinge screws and existing hinge mount holes 10 Attach the hopper extension side anges wh...

Page 6: ...ginal Front Top assembly with two 8 sheet metal screws Use front hole on Front top assembly side anges These will match up to holes on the sides of the Front HDK assembly Figure 11 Install of duct shi...

Page 7: ...justment knob The opposite of steps 1 2 17 Attach 4 diameter 20 24 gauge galvanized or aluminum ducting to outlets on HDK Ducts should slide through holes in the back plate and on to outlet tubes 18 I...

Page 8: ...ll or oor Duct runs should be less than 20ft for best results Wall 1 4 Insulation Wall and oor registers must be installed with supplied 1 4 insulation between ducting to register adapter and the comb...

Page 9: ...ard The circuit board will need to be detached from the frame a small at head screw driver will be required to connect wires see Figure 21 d There will be a purple wire coming form the circuit board t...

Page 10: ...10 Wiring Diagram...

Page 11: ...ription Replacement No 1 HDK Back Assembly 2 HDK Front Assembly 3 Lid Gasket 4 Cabinet Side Extention 5 Duct Shield 6 Slider Grill 7 Grill 8 Sensor Assembly 9 High Limit Sensor 220F EC 002 10 Fan Sens...

Page 12: ...12 MANUFACTURED BY SHERWOOD INDUSTRIES LTD 6782 OLDFIELD RD SAANICHTON BC CANADA V8M 2A3 www enviro com Oct 7 2013 C 14262...

Reviews: