Mount the two framing mount brackets on each side and secure the
fireplace to framing with screws or nails (refer to Figure 16). The brackets
will allow for a ½” (13 mm), ⅝” (16 mm), ¾” (19 mm) thick finishing
wall. The wall may be finished up to the fireplace facing with combustible
material.
Figure 16. Nail Tab.
Initial Installation
QUALIFIED INSTALLERS ONLY
F
Raming
m
ount
b
Rackets
:
c
oRneR
i
nstaLLation
:
The dimensions for installing a fireplace in the corner of a room are given in Figures 17 and 18. Refer to
“
i
nitial
i
nStallation
- v
ent
c
onfiGurationS
and
r
eStrictor
S
ettinGS
” for allowable pipe lengths.
Do not interfere with the structural integrity of the walls.
Figure 17. Dimensions for a corner installation, rear
vented.
15
Figure 18. Dimensions for a corner installation, top
vented.
R
aiseD
F
iRePLaces
anD
h
eaRths
:
Figure 20. Raised Fireplace with Floor Level Hearth
Figure 19. Raised Fireplace with Raised Hearth