Installation
Please read and understand these instructions before installing pedestal or ash pan and leg option.
Failure to follow these instructions carefully could cause personal injury or property damage. All screws
are pre-installed on the base of the unit.
R
EMOVAL
F
ROM
P
ALLET
:
• Remove the bricks from the unit before starting.
• Remove the two (2) lag bolts (shown in Figure 6) that
secure the unit to the pallet from inside the firebox.
Note:
Before the bricks are installed, rivets
(Figure 2) must be placed in the two (2)
holes (shown in Figure 7) in the firebox that
lag bolts came out of. This is done to make
unit burn more efficiently.
Figure 7:
Rivet.
Figure 6: Bolts to remove.
15
M
ODIFICATIONS
F
OR
I
NSTALLATION
WITH
19
1
/
16
” (484
MM
) H
IGH
L
INTEL
:
Insert Cabinet Top
Air Deflector
Figure 9: Removing Air Deflector onto Cabinet Top.
Figure 8: Removing Cabinet Top from Unit.
The Venice has a factory height of 19
9
/
16
” (497mm) and
it can be reduced to 19
1
/
16
” (484mm) by modifying the
unit and the surround panel.
Insert Unit:
1. Remove the thirteen T-20 screws holding the cabinet
top in place (refer to Figure 8).
2. Remove the cabinet top and flip it onto its top.
3. Remove the Air Deflector (shown in Figure 9) by
removing the two (2) T-20 screws.
4. Re-install the cabinet top onto the unit. The screw
holes along the top of the unit should now line up
with the top set of holes on the cabinet top.