background image

www.envertec.com 

EVT360

MICROINVERTER

User Manual 

Zhejiang Envertech Corporation Ltd. 

Tel

+86 579 8926 6326

 Web

www.envertec.com

  Email

[email protected]

 

    Add

24th Floor, Jintong Mansion,

      Center of Headquarters, Yongkang City,
         Zhejiang Province, China 

Summary of Contents for EVT360

Page 1: ...60 MICROINVERTER User Manual Zhejiang Envertech Corporation Ltd Tel 86 579 8926 6326 Web www envertec com Email info envertec com Add 24th Floor Jintong Mansion Center of Headquarters Yongkang City Zh...

Page 2: ...cription 4 3 Further information 5 Planning of Microinverter Installation 5 1 Symbols on Inverter 5 2 Accessories 5 3 Connection Method 6 Microinverter Installation 7 Debugging and Operaing 7 1 Energi...

Page 3: ...f the AC cable on the microinverter is damaged or broken do not install the unit Before installing or using the Envertech microinverter read all instructions and cautionary markings in the technical d...

Page 4: ...Faulty grounding protection Grid monitoring Current monitoring in grounding DC current monitoring EVT360 can be adapted to almost all 60 cell or 72 cell modules Before installation please check the pa...

Page 5: ...to public grid thus all work related to theinverter shall only be carried out by qualified personnel NOTICE danger This device directly connected with electricity generators and public grid Danger of...

Page 6: ...allation could only be implemented when the system is discon nected from the grid and the solar panel has been covered or discon nected WARNING 1 Mount microinverters onto the rack Mark out the estima...

Page 7: ...EVB300 plug into the socket Option 2 Wireless mode 1 Fix EVB300 at proper position in or close to the distribution box within the range Wi Fi signal 2 Turn off the air switch and connect EVB300 s powe...

Page 8: ...al com Click Sign Up Fill in the account information to finish registration Step 2 Under Device Management click Add and enter MI SN manually or click the QR Code icon on the right to scan the MI SN a...

Page 9: ...to manage grid parameters after all microinverters have been detected 7 2 EVT360 Operation The Envertech microinverter is powered on when there is sufficient DC voltage from the PV module The LED lig...

Page 10: ...f the load centers are within the ranges shown in the following table 4 Verify that AC line voltage at the junction box for each AC branch circuit is within the ranges required by local grid standards...

Page 11: ...reached its lifetime must be collected separately to the unit or individual that has obtained the qualification for disposing discarded electrical and electronic products For any equipment that you n...