Considerations Prior to Installation
3-2 Hardware Installation
Considerations Prior to Installation
When
installing
the
switch,
note
the
following:
•
Before
starting
the
installation
procedure,
notify
the
network
administrator
of
the
installation.
•
Follow
the
installation
procedures
in
the
order
as
presented
in
this
guide.
•
Do
not
connect
the
switch
to
the
network
until
you
have
established
the
correct
IP
address.
Required Tools
A
Phillips
screwdriver
is
required
to
install
the
switch
into
a
rack.
Unpacking the Switch
Unpack
the
switch
as
follows:
1.
Open
the
box
and
remove
the
packing
material
protecting
the
switch.
2.
Verify
that
the
contents
of
the
carton
contains
the
items
listed
in
Table 3
‐
1
.
3.
Remove
the
tape
seal
on
the
non
‐
conductive
bag
to
remove
the
switch.
4.
Perform
a
visual
inspection
of
the
switch
for
any
signs
of
physical
damage.
Contact
Enterasys Networks
if
there
are
any
signs
of
damage.
Refer
to
“
Getting
Help
”
on
page xvi
for
details.
Table 3-1 Contents of Switch Carton
Item
Quantity
C3G124-24P
or C3G124-48P switch device
1
Rack mounting bracket
2
M3x6-mm flathead screws
8
Rubber feet with adhesive backing for installation on a flat surface
4
AC power cord (The type of power cord is country-dependent.)
1
This installation guide
1
Customer Release Notes
1
URL notice card
1
Summary of Contents for SecureStack B3G124-24P
Page 2: ......
Page 14: ...xii...
Page 68: ...Using the Reset Switch 4 10 Troubleshooting...