Installing the S8 Chassis
Enterasys S-Series S8 Chassis Hardware Installation Guide 3-9
Installing the Cable Management Clips
You
can
keep
S
‐
Series
module
cables
neat
and
secure
by
installing
the
cable
management
clips
that
are
included
with
the
S8
chassis.
Using
the
cable
management
clips
ensures
that
cables
are
bundled
close
to
the
chassis
and
that
cabling
is
not
accidentally
loosened
or
disconnected
from
the
chassis
during
operation.
The
S8
chassis
ships
with
nine
cable
management
clips,
which
you
install
on
the
left
front
mounting
bracket
of
the
chassis
after
you
have
installed
the
chassis.
A
completed
installation
creates
eight
separate
cable
management
spaces,
one
for
each
module.
To
install
the
cable
management
clips:
1.
Slip
each
clip
into
the
slots
on
the
left
mounting
bracket.
See
.
Figure 3-5 Installing a Cable Management Clip in the Left Mounting Bracket
Note:
Installing the cable management clips is optional. If your installation location does not have
the space needed for installing the cable management clips (for example, in an enclosed rack), do
not install the cable management clips.
Summary of Contents for S4-Chassis
Page 2: ......
Page 12: ...x...
Page 16: ...xiv...
Page 20: ...Getting Help xviii About This Guide...
Page 28: ...Features 1 8 Introduction...
Page 62: ...Completing the Installation 3 32 Chassis Setup...