Enterasys K-POE-4BAY Installation Manual Download Page 12

x

Summary of Contents for K-POE-4BAY

Page 1: ...P N 9034570 01 Enterasys K Series K POE 4BAY PoE Shelf Hardware Installation Guide ...

Page 2: ......

Page 3: ...SUCH DAMAGES Enterasys Networks Inc 50 Minuteman Road Andover MA 01810 2012 Enterasys Networks Inc All rights reserved Part Number 9034570 01 February 2012 ENTERASYS ENTERASYS NETWORKS ENTERASYS SECURE NETWORKS and any logos associated therewith are trademarks or registered trademarks of Enterasys Networks Inc in the United States and or other countries For a complete list of Enterasys trademarks ...

Page 4: ...ustry Canada Notice This digital apparatus does not exceed the class A limits for radio noise emissions from digital apparatus set out in the Radio Interference Regulations of the Canadian Department of Communications Le présent appareil numérique n émet pas de bruits radioélectriques dépassant les limites applicables aux appareils numériques de la class A prescrites dans le Règlement sur le broui...

Page 5: ...municipal waste It must be collected and treated separately 3 It has been determined by the European Parliament that there are potential negative effects on the environment and human health as a result of the presence of hazardous substances in electrical and electronic equipment 4 It is the users responsibility to utilize the available collection system to ensure WEEE is properly treated For info...

Page 6: ...ials in the parts is above the relevant threshold of the SJ T 11363 2006 standard ᇍ䫔ଂП᮹ⱘ᠔ଂѻક ᴀ㸼ᰒ ߃ կᑨ䫒ⱘ ᄤֵᙃѻકৃ㛑ࣙ 䖭ѯ 䋼DŽ ᛣ ᠔ଂѻકЁৃ㛑Ӯгৃ㛑ϡӮ ᠔ ᠔ ⱘ䚼ӊDŽ This table shows where these substances may be found in the supply chain of Enterasys electronic information products as of the date of sale of the enclosed product Note that some of the component types listed above may or may not be a part of the enclosed...

Page 7: ...fiber under normal conditions is 12 6 dBm or 55 x 10 6 watts Removing the optical connector from the transceiver allows laser radiation to emit directly from the optical port The maximum radiance from the optical port under worst case conditions is 0 8 W cm 2 or 8 x 103 W m2 sr 1 Do not use optical instruments to view the laser output The use of optical instruments to view laser output increases e...

Page 8: ... Newbury Berkshire RG14 2PZ England Conformance to Directive s Product Standards EC Directive 2004 108 EC EN55022 2006 EN 55024 1998 A1 2001 A2 2003 EN 61000 3 2 2006 EN 61000 3 3 1995 A1 2001 A2 2005 EC Directive 2006 95 EC EN 60950 1 2006 A11 2009 A1 2010 EN 60825 1 2007 EN 60825 2 2004 A1 2007 Equipment Type Environment Information Technology Equipment for use in a Commercial or Light Industria...

Page 9: ...perability except to the extent expressly permitted by applicable law and to the extent the parties shall not be permitted by that applicable law such rights are expressly excluded Information necessary to achieve interoperability or correct errors is available from Enterasys upon request and upon payment of Enterasys applicable fee b Incorporate the Program in whole or in part in any other produc...

Page 10: ...ts showing i license fees due and paid and ii the use copying and deployment of the Program You also grant to Enterasys and its authorized representatives upon reasonable notice the right to audit and examine during Your normal business hours Your books records accounts and hardware devices upon which the Program may be deployed to verify compliance with this Agreement including the verification o...

Page 11: ...nforced to the maximum extent permissible Any such invalidity illegality or unenforceability in any jurisdiction shall not invalidate or render illegal or unenforceable such provision in any other jurisdiction 14 TERMINATION Enterasys may terminate this Agreement immediately upon Your breach of any of the terms and conditions of this Agreement Upon any such termination You shall immediately cease ...

Page 12: ...x ...

Page 13: ...eries AC Power Supply in the K POE 4BAY PoE Shelf 3 3 Connecting a K Series AC Power Supply to AC Power 3 5 Appendix A Specifications and Regulatory Compliance K POE 4BAY Shelf Specifications A 1 Power Supply Specifications A 1 K AC PS A 1 K AC PS 1400W A 2 Torque Values A 2 Regulatory Compliance A 2 Figures 1 1 K Series Chassis with K POE 4BAY Shelf 1 2 2 1 Loosening the Screws on the K Series Ch...

Page 14: ...K Series AC Power Supply in the K POE 4BAY PoE Shelf 3 4 3 4 Removing a Cover Plate from the K POE 4BAY PoE Shelf 3 5 Tables 2 1 Contents of the K POE 4BAY PoE Shelf 2 1 3 1 Contents of K Series AC Power Supply Carton 3 2 A 1 K POE 4BAY Shelf Specifications A 1 A 2 K AC PS Power Supply Specifications A 1 A 3 K AC PS 1400W Power Supply Specifications A 2 A 4 Recommended Torque Values by Screw Size ...

Page 15: ... listed below can be obtained from the World Wide Web in Adobe Acrobat Portable Document Format PDF at the following site https extranet enterasys com downloads Electrical Hazard Only qualified personnel should install or service this unit Riesgo Electrico Nada mas personal capacitado debe de instalar o darle servicio a esta unida Elektrischer Gefahrenhinweis Installationen oder Servicearbeiten so...

Page 16: ...ters Note Calls the reader s attention to any item of information that may be of special importance Caution Contains information essential to avoid damage to the equipment Precaución Contiene información esencial para prevenir dañar el equipo Achtung Verweißt auf wichtige Informationen zum Schutz gegen Beschädigungen Warning Warns against an action that could result in personal injury or death Adv...

Page 17: ...r your K POE 4BAY PoE shelf for warranty support at www enterasys com support register your product aspx Registering your K POE 4BAY PoE shelf is an important part of the warranty process Registering tells Enterasys that the warranty or maintenance agreement is active as well as other important information that ensures Enterasys can provide support in a fast efficient and effective manner Warranty...

Page 18: ...Registering Your Product xvi About This Guide ...

Page 19: ...4BAY PoE shelf in a restricted access location The K POE 4BAY PoE shelf can be installed as a freestanding unit or installed into a standard 48 26 centimeter 19 inch rack Each K Series AC power supply installed in the K POE 4BAY PoE shelf connects to the PoE connector on the rear of a K Series chassis Use a K POE CBL 2M cable to connect a K Series AC power supply installed in a K POE 4BAY PoE shel...

Page 20: ...the equipment by users must be restricted through the use of a tool or lock and key or other means of security and is controlled by the authority responsible for the location Advertencia Instalar el K POE 4BAY en un lugar de Acceso Restringido Acceso al equipo debe ser restringido mediante el uso de una herramienta o candado o cualquier otro método de seguridad y debe ser controlado por el respons...

Page 21: ...ton as listed in the Table 2 1 Electrical Hazard Only qualified personnel should perform installation procedures Riesgo Electrico Solamente personal calificado debe realizar procedimientos de instalacion Elektrischer Gefahrenhinweis Installationen sollten nur durch ausgebildetes und qualifiziertes Personal vorgenommen werden Note Before installing the K POE 4BAY PoE shelf ensure that you read the ...

Page 22: ...stalling the PoE Shelf on Top of a K Series Chassis on page 2 2 For information on installing the PoE shelf by itself in a two post rack see Installing the PoE Shelf in a Two post Rack on page 2 6 Installing the PoE Shelf on Top of a K Series Chassis You must supply four rack screws to complete this installation To install the PoE shelf on top of a K Series chassis 1 Optional Loosen the back screw...

Page 23: ...ion Guide 2 3 Figure 2 2 Installing the PoE Shelf on Top of the K Series Chassis 3 If you have loosened the back screws on the K Series chassis ensure that the tabs at the back of the PoE shelf slide onto the loosened screws See Figure 2 3 Figure 2 3 Securing the Rear of the PoE Shelf ...

Page 24: ...th the K POE 4BAY RAIL rail kit you can install the PoE shelf in a four post rack You must supply eight rack screws to complete this installation To install the PoE shelf in a four post rack 1 Attach the long rails included with the PoE shelf to the sides of the PoE shelf as shown in Figure 2 4 Flat washers and pan head screws are included with the K POE 4BAY RAIL rail kit for attaching the rails ...

Page 25: ... using eight customer supplied rack screws two screws for each mounting ear See Figure 2 5 Figure 2 5 Securing the PoE Shelf in a Four post Rack You have completed the installation of the PoE shelf You can now connect the PoE shelf to the K Series chassis and install power supplies in the PoE shelf See Chapter 3 Installing a Power Supply ...

Page 26: ...Rails on page 2 9 Front Mounting the PoE Shelf in a Two post Rack 3 inch Rails You must supply eight rack screws to complete this installation To front mount the PoE shelf in a two post rack with 3 inch rails 1 Attach the short rails included with the K POE 4BAY RAIL rail kit to the sides of the PoE shelf as shown in Figure 2 6 Flat washers and pan head screws are included with the K POE 4BAY RAIL...

Page 27: ...ation of the PoE shelf You can now connect the PoE shelf to the K Series chassis and install power supplies in the PoE shelf See Chapter 3 Installing a Power Supply Mid mounting the PoE Shelf in a Two post Rack 3 inch Rails You must supply four rack screws to complete this installation To mid mount the PoE shelf in a two post rack with 3 inch rails 1 Attach the short rails included with the K POE ...

Page 28: ...Figure 2 9 Figure 2 9 Mid mounting the PoE Shelf in a Two post Rack 3 inch Rails 3 Attach the PoE shelf to the rack rails using four customer supplied rack screws two screws for each mounting ear See Figure 2 9 You have completed the installation of the PoE shelf You can now connect the PoE shelf to the K Series chassis and install power supplies in the PoE shelf See Chapter 3 Installing a Power S...

Page 29: ... rails 1 Attach the short rails included with the K POE 4BAY RAIL rail kit to the sides of the PoE shelf as shown in Figure 2 10 Flat washers and pan head screws are included with the K POE 4BAY RAIL rail kit for attaching the rails to the shelf Figure 2 10 Attaching the Short Rails to the PoE Shelf for Front Mounting in a Two post Rack 7 inch Rails 2 Place the PoE shelf in the rack as shown in Fi...

Page 30: ...rails using eight customer supplied rack screws two screws for each mounting ear See Figure 2 11 You have completed the installation of the PoE shelf You can now connect the PoE shelf to the K Series chassis and install power supplies in the PoE shelf See Chapter 3 Installing a Power Supply ...

Page 31: ...power supply from its protective plastic bag 4 Examine the power supply carefully checking for damage If there are any signs of damage DO NOT install the power supply instead contact Enterasys Networks Refer to Getting Help on page xiv for details Electrical Hazard Only qualified personnel should perform installation procedures Riesgo Electrico Solamente personal calificado debe realizar procedimi...

Page 32: ...move the cover from the recessed PoE connector at the rear of the K Series chassis See Figure 3 1 If you are connecting two power supplies to a K10 chassis remove the covers from both PoE connectors Figure 3 1 Removing the Cover from the PoE Connector on a K Series Chassis Table 3 1 Contents of K Series AC Power Supply Carton Item Quantity K Series AC power supply 1 For USA shipments NEMA power co...

Page 33: ... Chassis 4 Repeat steps 2 and 3 if connecting a second K Series AC power supply to the K Series chassis Installing a K Series AC Power Supply in the K POE 4BAY PoE Shelf To install a K Series AC power supply in the K POE 4BAY PoE shelf 1 Attach the anti static wrist strap before handling the power supply Hold the power supply by placing one hand on the handle located on the front panel and using t...

Page 34: ...ly to the shelf by screwing the captive screws into the shelf 5 If you are installing more than one power supply remove the coverplates from the applicable number of power supply slots as shown in Figure 3 4 Keep the coverplates in the event you need to remove the power supplies Caution Forcing a misaligned power supply into place can damage the power supply and or the chassis backplane Precaución...

Page 35: ... AC power socket on the front panel of the power supplies 2 Plug each of the power cords into separate dedicated 15 A 120 Vac receptacles 3 Ensure that the LEDs on each power supply are green If you experience any problems with this installation contact Enterasys Networks for assistance 1 Power supply slot 3 Coverplate screws 2 Coverplate Note If multiple power supplies are installed repeat the fo...

Page 36: ...Connecting a K Series AC Power Supply to AC Power 3 6 Installing a Power Supply ...

Page 37: ...following Enterasys Networks support Web site http secure enterasys com support mtbf K POE 4BAY Shelf Specifications Power Supply Specifications K AC PS Table A 1 K POE 4BAY Shelf Specifications Item Specification Dimensions 4 52 cm x 44 70 cm x 33 23 cm 1 78 in x 17 60 in x 13 09in Weight 3 26kg 7 2 lb Environmental Requirements Operating Temperature 5 C to 45 C 41 F to 113 F Storage Temperature ...

Page 38: ...e Values by Screw Size Screw Size Torque in Pounds Bit Size English Metric 5 Nominal 5 N A N A 1 42 1 5 1 57 0 2 56 1 5 2 85 3 0 3 15 0 4 40 2 5 4 75 5 0 5 25 0 1 6 32 3 5 8 55 9 0 9 45 1 8 32 4 5 17 10 18 0 18 90 2 10 32 5 30 40 32 0 33 60 2 1 4 20 6 5 63 65 67 0 70 35 3 Table A 5 Compliance Standards Regulatory Compliance Standard Safety UL 60950 1 FDA 21 CFR 1040 10 and 1040 11 CAN CSA C22 2 No...

Reviews: