Unpacking the Module
3-2
Installation
-
3.1
UNPACKING THE MODULE
Unpack the module as follows:
1.
Open the box and remove the packing material protecting the module.
2.
Verify the contents of the carton as listed in
Table 3-1
.
3.
Remove the tape seal on the non-conductive bag to remove the module.
4.
Perform a visual inspection of the module for any signs of physical damage. Contact Enterasys
Networks if there are any signs of damage. Refer to
“Getting Help”
in
About This Guide
for
details.
3.2
INSTALLING OPTIONS INTO THE 5G106-06
The optional GPIMs are hot-swappable and may be installed before or after the module (host
module) is installed into the chassis. However, for convenience in a new installation, it is
recommended that you install GPIMs before installing the module in the chassis.
Whether you install GPIMs before or after installing the host module, use the following
instructions to prevent damaging either the GPIM or the host module.
There are two different physical styles of GPIMs that can be installed into the module, as shown in
Figure 3-1
. One style has the squeeze-latch side clips (
Figure 3-1
, view A), with the procedure in
Section 3.2.1
. The other style has the locking bar (
Figure 3-1
, view B), with the procedure in
Section 3.2.2
.
Table 3-1
Contents of Module Carton
Item
Quantity
5G102-06 or 5G106-06
1
Antistatic Wrist Strap
1
Manual Accessory Kit
1
NOTE:
If you are installing a 5G102-06, proceed to
Section 3.3
. Otherwise, proceed to
Section 3.2
for instructions on installing various options into the 5G106-06.