background image

      Activate Monitoring

Register the IQ Envoy in Enlighten (

enlighten.enphaseenergy.com)

.

Method A  // If the IQ Envoy is associated with a system in Installer Toolkit

A )  On your mobile device, go to Settings and disconnect from the Envoy’s 

AP Wi-Fi network.

B )  Return to the Installer Toolkit app and tap the 

Sync 

button on the Sys-

tem Overview screen.

C )  When you have access to a computer, log in to Enlighten and select the 

system name from the Activation List on the dashboard.

D )  From the activation form, open Array Builder.
If you used Installer Toolkit to build arrays and scan device serial numbers, 

the array(s) are built  . Make any necessary adjustments in Array Builder.
If you did NOT use Installer Toolkit to build arrays and scan device serial 

numbers, create the virtual array in Array Builder using the installation map 

as your reference. 

Method B // If the IQ Envoy is NOT associated with a system in  

Installer Toolkit

A )  Log into Enlighten and click 

Add a New System

 from the dashboard.

B )  Enter the System, Installer, Owner, and Location information.
C )  Enter the IQ Envoy serial number.
D )  Click 

Save

 to submit the form.

E )  After the devices have reported to Enlighten, open Array Builder from the 

activation form, and create the virtual array, using the installation map 

as your reference.

12

TROUBLESHOOTING

Contact Enphase Customer Support (

enphase.com/en-us/support/contact

) if 

you have any questions about troubleshooting your system.

a

 

LED overview

LED

State

Description

All

Flashing amber in unison

The IQ Envoy is booting up

Flashing green sequentially Software upgrade in progress

Network

communica-

tions

Solid green

Communicating with Enlighten

Flashing green

WPS connection in progress, or

IQ Envoy is attempting to connect to Enlighten

Solid amber

Local network connection only

Off

No network connection

AP mode

Solid green

AP mode enabled: 

IQ Envoy Wi-Fi network available

Off

AP mode disabled:

IQ Envoy Wi-Fi network unavailable

Power  

production

Solid green

All communicating microinverters are producing

Flashing green

Microinverter upgrade in progress

Solid Amber

At least one microinverter is not producing

Off

Microinverters are not communicating 

(low light or night time)

Device

communica-

tions

Solid Green

All devices are communicating

Flashing Green

Device scan in progress

Solid Amber

At least one device is not communicating

Off

Devices are not communicating 

(low light or night time)

b

 

Device detection issues

If the Device Communications LED 

 lights solid amber, it may be a result 

of low light levels. If there isn’t enough sunlight to power up the microinvert-

ers, they can’t communicate with the Envoy.
If there is sufficient daylight for the microinverters to power up, the issue 

may be that the Envoy is having difficulty communicating over the power 

lines. To troubleshoot this issue: 

•  Check the Installer Toolkit mobile app to see which devices are not com-

municating. 

•  Check that the circuit breaker(s) in the IQ C for the PV array are 

in the “ON” position. 

•  Verify that the PV modules are connected to the microinverters. 

•  Verify the PV module DC voltage is within the allowable range for the 

microinverter.

c

 

Power production issues

If the Power Production LED   lights solid amber, check the Installer Toolkit 

mobile app to see which microinverters are not producing:

•  If none of the microinverters are producing power, there may be a grid or 

wiring issue. First, verify that there is proper input voltage and frequency 

from the utility. Next, check the breaker and wiring, starting at the load 

center.

•  If all of the non-productive microinverters are on the same branch, check the 

breaker and wiring starting at the junction box for the affected branch.

•  If only one or scattered microinverters are not producing power, first check 

to see that the AC connectors are fully seated. Next, check that each mod-

ule is providing the required startup voltage for the microinverter (22V). A PV 

module that is failing or that is undersized may not generate enough power 

for AC conversion.

d

 

Internet connection issues

If you are using Wi-Fi and the Network Communications LED 

 remains off 

or solid amber:

•  The WPS connection window may have timed out. Retry the connection 

steps.

•  Make sure that the broadband router is connected and operational by 

checking that other devices at the site can access the network. 

•  Be aware that metal enclosures or obstructions impede wireless communi-

cation. 

•  If you don’t see your router/access point in the list on the Envoy, or cannot 

maintain a connection, you may need to add a wireless repeater to extend 

the network range.

You can troubleshoot network issues with the Installer Toolkit mobile app by 

tapping the 

Network

 button, then 

Diagnostic Tools

.

If you are using the Enphase Mobile Connect modem and the Network Com-

munications LED remains off or lights solid amber, see Troubleshooting in the 

Enphase Mobile Connect Installation Guide.

If you replace your router, configure the IQ Envoy Wi-Fi settings for the new Wire-

less Network Name (SSID) and password, or use the WPS function described in 

Installation Step 10.

e

 

Loss of AC to a single branch of microinverters

If a single branch of microinverters is not producing, it may indicate loss of AC 

to the branch. 

•  Use a multi-meter set to AC to test the breaker lugs. The result should be 

around 240 VAC.

•  If not, switch the breaker off and on to reset. 

f

 

Inoperable IQ Envoy (all LEDs off)

If the IQ Envoy is not receiving power, all LEDs will be off. 

•  Use a multimeter set to AC to test line 1 on the Envoy breaker to the AC 

neutral busbar. The result should be around 120 VAC.

g

 

Inoperable IQ Envoy and no AC to branch

If a branch of microinverters is not producing and the IQ Envoy LEDs are off: 

•  Test at the main lugs for L-L and L-N voltages. The results should 

be around 240 VAC and 120 VAC respectively. If not, there may be a 

problem with the wiring from the panel.

Summary of Contents for IQ Combiner+

Page 1: ... that installation of the Combiner has two parts To ensure successful device detection complete Part 2 after install ing any Enphase IQ Microinverters and or Enphase AC Battery ies Note If needed you can find an installation map at the back of any Enphase Microinverter Quick Install Guide Model X IQ AM1 240 2 IQ Envoy Display and Controls Network Communications LED Green when IQ Envoy is connected...

Page 2: ... sized to meet local code requirements and voltage drop rise considerations B Bring in the wires from each AC branch circuit C Connect the ground green or green yellow to the ground busbar D Pass the L1 conductors from each PV branch circuit through the produc tion CT in the same direction as the arrow on the side of the CT E If you use the fourth Battery PV breaker position for PV you must route ...

Page 3: ...nstall consumption metering CTs DANGER Risk of electrocution Do not install CTs when cur rent is flowing in the sensed circuit Always install CT wires in the terminal blocks before energizing the sensed circuit Load Center To Grid From IQ Combiner IQ Envoy Terminal Block Relay contacts if needed UP TO 250 Vac 100A 0 5V 45 66Hz white blue Not used white blue P1 C1 C2 1 2 3 4 NO Ref Common C Digital...

Page 4: ...file settings 8 INSTALLATION Part 2 You must complete Installation Part 2 after installing any Enphase IQ Microinverters and or Enphase Battery ies Detect Devices A Turn on the DG breaker s B Use one of the following methods to detect devices Enphase IQ Microin verters and or Enphase Batteries Method A Provision devices with Installer Toolkit Use the Installer Toolkit mobile app to configure the I...

Page 5: ...Toolkit mobile app to see which devices are not com municating Check that the circuit breaker s in the IQ Combiner for the PV array are in the ON position Verify that the PV modules are connected to the microinverters Verify the PV module DC voltage is within the allowable range for the microinverter c Power production issues If the Power Production LED lights solid amber check the Installer Toolk...

Page 6: ...eded WARNING Before installing or using the IQ Combiner read all instruc tions and cautionary markings in the technical description and on the equipment WARNING Use the circuit breakers in the Enphase IQ Combiner only for serving Enphase equipment No other loads are allowed FCC Statement This equipment has been tested and found to comply with the limits for a Class B digital device pursuant to par...

Reviews: