Enpower smart switch installation and operation
© 2020 Enphase Energy Inc. All rights reserved.
141-00046-01
11
Enphase Enpower Installation
Installing the Enphase Enpower smart switch involves several key steps. Each step listed here is detailed
in the following pages.
: Plan a Location for the Enpower
Install the Wall-Mount Bracket
: Unbox and Mount the Enpower on the Wall
Step 1: Plan a Location for the Enpower
The Enpower housing is NEMA type 3R and can be installed indoors or outdoors.
A. Follow all local codes and standards when planning for and installing the Enphase Enpower
Smart Switch.
B. Choose a well-ventilated location where the ambient temperature is within -40° C to 50° C (-40° F
to 122° F), preferably out of direct sunlight.
C. Ensure that the mounting location can sustain the weight of the Enpower and mounting bracket
38.5 kg (85 lbs). The wall must include studs that can bear 38.5 kg (85 lbs) or can be of masonry
or other suitable structure that can bear the weight.
D. Plan the mounting location:
•
Indoors: at least 15cm (six inches) off the ground and 15cm (six inches) from the ceiling.
•
Outdoors: at least 91cm (three feet) off the ground.
E. Ensure that there are no pipes or electrical conductors where you plan to drill.
F. Plan to maintain at least 90cm (three feet) of clearance in front of the Enpower.
G. Consider the dimensions of the Enpower, easy access, unit height, conduit entry, and length of
cable when selecting the location.
H.
Select a location where you can interconnect to the site’s load center using the Enphase
Enpower.