SECONDARY AIR TUBE REPLACEMENT
(see Figure 5.7)
1.
Remove cotter pin at RH end of the tube.
2.
Slide tube to the left and lower the tube end below RH plenum.
3.
Slide tube to right to remove.
4.
Reassemble in reverse order using a new cotter pin. The cotter pin is a hammerlock
style and locks into place by hitting the head sharply with a hammer.
5.
Note that any tube can be replaced without disturbing the baffle.
Important Notes:
Figure 5.7
– Secondary air tube replacement
The air tubes are identified for placement as follows:
Model
Type of tube
Solution 2.9
All tubes ► 65 holes of 7/64"
#1
#2
Summary of Contents for Solution 2.9
Page 2: ......
Page 6: ...5 ...
Page 7: ...6 622mm ...
Page 13: ...12 FIGURE 2 3 Clearances to combustible materials and floor protection ...
Page 16: ...15 Clearances for shield construction ...
Page 24: ...23 FIGURE 3 2 2 B Factory Built Thimble FIGURE 3 2 2 C Brick Thimble ...