Cambridge Pellet Stove Installation and Operation Manual
19
United States:
•
Not Less than 36
"
(91 cm) above any forced air inlet located within 120
"
(305 cm);
•
Not Less than 48
"
(122 cm) below and horizontally from, or 12
"
(30 cm) above, any door, window
or gravity air inlet into any building;
•
Not Less than 24
"
(61 cm) from an adjacent building and not less than 84
"
(213 cm) above grade
when located adjacent to a public walkway;
•
Cannot be located less than 12
"
(30 cm) above grade;
•
Cannot be located above a gas meter/regulator within 36
"
(91cm) horizontally of the vertical
center line of the regulator;
•
Not within 6 feet (183 cm) of a gas service regulator vent outlet;
•
Other restrictions may apply. See NFPA 211 for further information.
4.4.1.1
Direct Vent System (2-in-1 Exhaust and fresh air intake)
In Canada:
The permitted termination location for a direct vent system are the same than those
permitted with a regular pellet vent system.
In the Unites States :
The permitted termination location for a direct vent system are the same than
those permitted with a regular pellet vent system except for the following : The exit terminal shall be
located not less than 9" (23 cm) from any opening through which vent gases could enter a building.
4.5
Installation Configurations
4.5.1
Installation Warnings, Cautions and Recommendations Reminder
CAUTION
•
PROFESSIONNAL INSTALLATION IS HIGHLY RECOMMENDED.
•
THIS STOVE USES A PRESSURIZED VENTING SYSTEM. ALL VENT CONNECTOR JOINTS MUST BE
SEALED AND FASTENED. YOU MAY USE RTV SILICONE (ROOM TEMPERATURE VULCANISATION),
METALLIC TAPE, AND A MINIMUM OF THREE SELF-TAPING SCREWS AT ALL JOINT
CONNECTIONS TO ENSURE A TIGHT SEAL
.
CONSULT THE PELLET VENT MANUFACTURER’S
INSTRUCTION TO ENSURE PROPER INSTALLATION, CONSISTENT PERFORMANCE, AND TO
AVOID SMOKE AND ASH SPILLAGE.
•
THE CHIMNEY CONNECTOR SHALL NOT PASS THROUGH AN ATTIC OR ROOF SPACE, CLOSET OR
SIMILAR CONCEALED SPACE OR FLOORS OR CEILING.
•
INSTALL VENTING SYSTEM AT CLEARANCES SPECIFIED BY THE VENT MANUFACTURER.
•
THE USE OF A SPARK ARRESTER AT THE END OF THE TERMINATION IS MANDATORY. IT IS
IMPORTANT THAT THE SPARK ARRESTER BE CLEAR OF ANY DEBRIS AT ALL TIME.
Summary of Contents for Cambridge EP00075
Page 64: ...64 Cambridge Pellet Stove Installation and Operation Manual 10 WIRING DIAGRAM ...
Page 73: ...Cambridge Pellet Stove Installation and Operation Manual 73 ...
Page 74: ...74 Cambridge Pellet Stove Installation and Operation Manual ...
Page 75: ...Cambridge Pellet Stove Installation and Operation Manual 75 ...
Page 76: ...76 Cambridge Pellet Stove Installation and Operation Manual ...
Page 77: ...Cambridge Pellet Stove Installation and Operation Manual 77 ...
Page 78: ...78 Cambridge Pellet Stove Installation and Operation Manual ...
Page 79: ...Cambridge Pellet Stove Installation and Operation Manual 79 ...