13
CLEARANCES
COMBUSTIBLE SHELF
FLOOR
PROTECTION
6"
11"
10 1/2"
6"
(FROM DOOR
OPENING)
7"
Figure 35
Clearances
DOOR OVERLAY INSTALLATION
In order to complete the assembly of your Enerzone Bio 35, you need to install the door overlay.
Figure 36
Door overlay installation
1- Position the overlay on the door
frame and fix it in place from behind
using the 4 screws.
Note:
It is not necessary to remove the
glass or any other component to install
the overlay.