37
QuadGuard
®
cz
1b) To Move 6 through 9-Bay
System Assembled
1. Remove all anchor nuts and bolts.
2. Attach a four point sling to each plate. Place sling
through the lifting loops located on each corner
of the plates, see Figure 54.
3. Free the system from anchor bolts and grout prior
to lifting. To accomplish this, start at the nose of
the system and use pry bars to gradually raise
the system off of the studs. Place blocks such
as 2x4's under the anchor plates and work down
the length of the system until the system is com-
pletely free of the studs.
4. Attach slings to a multiple spread lifting bar/beam
and adjust sling positions as needed in order to
balance the system.
5. Lift the system to new location.
6. Replace all damaged parts.
7. Re-install system.
Figure 54
Lifting the System in 6 through 9-Bay Assembled Sections
90 DEG. MAX.
90 DEG. MAX.
Mo
Mo
Mo
Mo
Moving the S
ving the S
ving the S
ving the S
ving the System (cont'd.)
ystem (cont'd.)
ystem (cont'd.)
ystem (cont'd.)
ystem (cont'd.)