The QuadGuard cz MP-3 Anchoring System is the recom-
mended anchoring system for the QuadGuard cz. It can
be used on Portland Cement Concrete (P.C.C.), on As-
phalt Concrete (A.C.) over P.C.C., on A.C. over Compacted
Subbase (C. S.), and on A. C. alone. The foundations meet-
ing the specifications are listed on pages 12 & 14.
The QuadGuard cz MP-3 Anchoring System consists of
studs, anchor rods, and contents for mixing MP-3 grout.
The components of this anchoring system are used in
varying ways, depending on the type of foundation.
Foundation A (from page 7)
The 180 mm [7"] studs are only used in Foundation A,
and are embedded to a depth of 140 mm [5.5"].
Foundation B, C, or D (from page 7)
The 460 mm [18"] long studs are used in Founda-
tions B, C or D, and are embedded to a depth of
420 mm [16.5"].
Note: Contact Energy Absorption Systems, Inc. be-
fore using supplied anchoring system to anchor
in materials outside of these guidelines.
1. Drill holes
Position the QuadGuard cz Backup and Monorail as-
sembly according to the plans supplied with the sys-
tem. Use the QuadGuard cz Backup and Monorail
assembly as a template for drilling the anchor holes.
Use the recommended embedment depths stated on
page 12 & 14 and drawing package. Drill 22 mm
[7/8"] diameter holes using a rotary percussive drill.
2. Clean the holes
Brush each hole with a stiff bristled brush and clean
with oil-free compressed air to remove the dust. If the
hole is wet, completely flush it with water while brush-
ing then blow it clean using oil-free compressed air.
3. Mix and pour grout into holes
Follow instructions for vertical installations described
on page 28 noting the following:
When using the 180 mm [7"] studs fill the hole ap-
proximately 1/3 full.
When using the 460 mm [18"] studs fill the hole com-
pletely (approximately 1/4 of the contents of the can).
Do not underfill the hole.
When using the 460 mm [18"] long studs it may be
necessary to drive the stud down with a hammer so
that the washer and nut come in contact with the
platform.
4. Torque the nuts
Once the grout has hardened (see Table B on
page 29), torque the nuts on the 180 mm [7"] long
studs to 165 Nm [120 ft-lbs]. The nuts on the 460 mm
[18"] long studs are tightened until they are just snug
against the QuadGuard cz platform (less than 15 Nm
[10 ft-lbs]).
WARNING!
Do not allow the MP-3 Resin or Hardener to contact
skin or eyes. See material safety data sheet supplied
with the MP-3 kit for first-aid procedures. Use only in
well-ventilated area. Do not use near open flame.
WARNING!
Wear safety goggles and gloves during installation.
Note:
Walk-up inspections are recommended at least
once every six months for installations on asphalt.
MP
MP
MP
MP
MP-3
-3
-3
-3
-3
®
®
®
®
®
P
P
P
P
Pol
ol
ol
ol
oly
y
y
y
yester
ester
ester
ester
ester Anc
Anc
Anc
Anc
Anchoring S
horing S
horing S
horing S
horing System (cont’
ystem (cont’
ystem (cont’
ystem (cont’
ystem (cont’d.)
d.)
d.)
d.)
d.)