
QuadGuard
®
cz
2
Impor
Impor
Impor
Impor
Important Intr
tant Intr
tant Intr
tant Intr
tant Introductor
oductor
oductor
oductor
oductory Notes
y Notes
y Notes
y Notes
y Notes
Proper installation of the QuadGuard cz is essential to as-
sure maximum performance. Take the time to review the
installation instructions and product limitations thoroughly
before performing the necessary work. Do not attempt to
install any crash cushion without the proper plans and
installation manual from the manufacturer.
If you need additional information, or have questions about
the QuadGuard cz, please call Energy Absorption Systems’
Customer Service Department at (888) 323-6374.
S
S
S
S
System Ov
ystem Ov
ystem Ov
ystem Ov
ystem Over
er
er
er
ervie
vie
vie
vie
view
w
w
w
w
The QuadGuard cz is a highly efficient, redirective, non-
gating crash cushion for hazards ranging in width from
610 mm to 915 mm (2' to 3'). It consists of crushable,
energy-absorbing cartridges surrounded by a framework
of Quad-Beam
TM
panels.
The QuadGuard cz utilizes two types of cartridges in a
"staged" configuration to address both lighter cars and
heavier, high center-of-gravity vehicles. Its modular de-
sign allows the system length to be tailored to the design
speed of a site. Refer to the QuadGuard Product Manual
to determine the appropriate length system for a given
design speed.
Crash P
Crash P
Crash P
Crash P
Crash Perf
erf
erf
erf
erformance
ormance
ormance
ormance
ormance
The 6 bay QuadGuard cz has successfully passed the
NCHRP 350, Test Level 3 tests with both the light car and
pickup truck at speeds up to 100 km/h (62 mph) at angles
up to 20 degrees.
During head-on impacts, the QuadGuard cz telescopes rear-
ward and crushes to absorb the energy of impact. When
impacted from the side, it safely redirects the vehicle back
toward its original travel path and away from the hazard.
RETURN GOODS POLICY
Before returning any goods for credit please contact
Energy Absorption Systems Inc. Customer Service De-
partment at 1-888-323-6374 or your local distributor
for proper instructions.
Table of Contents
Installation ............................................... 3
Required Tools ................................................... 3
How to Determine Left/Right ............................. 5
Counting the Number of Bays ............................ 5
Measuring The Width ........................................ 6
Site Preparation/Foundation .............................. 6
QuadGuard cz Foundations ................................ 7
Bidirectional Sites .............................................. 7
Inspect Shipping ................................................ 8
Installation Procedures ...................................... 8
Transition Panel Types ....................................... 9
MP-3® Polyester Anchoring System ............... 30
Vertical Installations ........................................ 30
Horizontal Installations .................................... 31
MP-3® Installation Cautions ........................... 32
QuadGuard cz MP-3® Anchoring System ....... 33
Moving the System .................................... 34
QuadGuard cz (without Plate) .......................... 34
QuadGuard cz (with Plate) ............................... 36
QuadGuard cz (with Plate and Optional DPA
Anchorage) ...................................................... 38
Maintenance and Repair ............................. 40
Inspection Frequency ....................................... 40
Visual Drive-By Inspection ............................... 40
Walk-Up Inspection ......................................... 40
Post-Impact Instructions ................................. 41
Parts Ordering Procedure ................................ 44